My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/09/20 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/09/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 9:04:44 AM
Creation date
3/1/2017 9:04:28 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/20/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> CITY OF EVERETT <br /> PUBLIC WORKS <br /> REQUEST FOR QUALIFICATIONS <br /> WATER TRANSMISSION LINE PROTECTION PROJECT <br /> The City of Everett is requesting Statements of Qualifications(SOQs)for the permitting and design of <br /> improvements for protecting a partially submerged water transmission line. The work may include site <br /> evaluations, wetland and habitat surveys and assessments, surveying and preparation of base maps, <br /> surface water hydraulic evaluations, conceptual and final designs of the protection system, geotechnical <br /> engineering, preparation of applications of federal, state, and county permits, and preparation of final <br /> design plans and specifications. <br /> The following must be submitted with the SOQs: <br /> 1. A list and description of at least three similar projects from the past 5 years, including: <br /> a. Project management approach. <br /> b. Initial and final design budget and schedule performance. <br /> c. Construction budget(Engineers Estimate vs. final cost)and schedule(anticipated vs. final). <br /> d. Any projects completed in the Snohomish River Lower Basin and estuary. <br /> e. Permitting experience for local,state and federal permits for similar projects. <br /> f. Public Involvement experience. <br /> 2. Project staffing, including: <br /> a. Qualifications and availability of the proposed project manager, staff, and any subconsultants. <br /> b. The role the person performed in the above-mentioned projects and the proposed role for the <br /> design team. <br /> c. Office location where the project personnel will be working. <br /> 3. Firms overall approach to Project Management including budget and schedule tracking, <br /> communication and quality assurance/control. <br /> Submittals shall be 20 pages or less including any resumes or cover letters. Font sizes shall be 11-point <br /> minimum. Six (6)copies of the SOQs must be submitted to the City of Everett, Attention: Mark Sadler, <br /> 3200 Cedar Street, Everett, Washington 98201. The deadline for submittals is 5:00 p.m.,October 17, <br /> 2006. <br /> The SOQs will be evaluated and, based on the results,the City may request RFPs, interview as many as <br /> necessary to make its final selection,or enter into contract negotiations with the selected consultant(s). <br /> Please contact Mark Sadler with questions at(425)257-7215 or msadler@ci.everett.wa.us. <br /> 5 <br /> SMSadler WORD Maim Sup 11S dd6 SOQ request 090S06.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.