Laserfiche WebLink
L11 T Vr r v t tci l 1 <br /> 4 FINAL CONTRACT VOUCHER CERTIFICATION <br /> )NTRACTOR: Stripe Rite, Inc. ADDRESS: P 0 Box 1724 <br /> TY: Aurburn STATE: WA 98071 DATE: August 23, 2006 <br /> OJECT TITLE: 2006 Pavement Marking WORK ORDER NO. PW3245 <br /> ATE WORK COMPLETE: July 24, 2006 FINAL AMOUNT: $ 43,742.50 <br /> CONTRACTOR'S CERTIFICATION <br /> the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> d material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> thorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> iployee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> Dnies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> tderstand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature <br /> rich I ma hav- a ' ` : e t of the performance of said contract, which are not set forth in said estimate. <br /> � X <br /> ON RACT R TITLE 5ORG1 t t tl� <br /> NV- `vino► "' <br /> ripe Rite, Inc. _ .e � ► <br /> ibscribed and sworn to before ; , •' g <br /> e this Ste' day of 1 s. IDC-\( - %, <br /> p�0v'`0 t <br /> H • • Notary Public s''rlh$4-04,, <br /> and for the State of Washington, residing at (nl G (koY, t�}F} , 14 <br /> llif,,TF OF\\`. <br /> PUBLIC WORKS DEPARTMENT� CERTIFICATION <br /> i ertify the_ attached final APPROVED j <br /> ROVED Date: l ' <br /> 13 <br /> timate to base upon actual <br /> easurements and to be true and correct. <br /> 114 <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> le Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> ;ents and forwarded with the Final Contract Voucher Certification. <br /> Dntractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> tached. <br /> evised 9/94 <br /> 7 <br />