My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/10/04 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/10/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 9:30:44 AM
Creation date
3/1/2017 9:30:35 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/4/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Award Contract to Advanced Consent COUNCIL BILL# <br /> Construction, Inc., in the amount of X Action Originating Department Parks <br /> $800,000.00 plus Washington State First Reading Contact Person Kaftanski/Dance <br /> Sales Tax for the Walter E Hall Second Reading Phone Number Ext. 7335 <br /> Golf Cart Path Improvements and Third Reading FOR AGENDA OF October 4,2006 <br /> authorize the Mayor to sign a Public Hearing <br /> construction agreement with Initialed by: n' <br /> Advanced Construction, Inc. Department Head )0 <br /> CAA ---3-12C- <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> W. E. Hall Golf Course City Council Call for Bid Results Parks,Admin,Legal <br /> 1226 W. Casino Rd. Bids 8/16/2006, <br /> Budget Committee Bid <br /> Award Approval 9/27/06 <br /> Expenditure Required $ 800,000+WSST 440 5243070000 650 <br /> Amount Budgeted $ 900,000 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> This project will result in paving of the existing gravel cart paths at Walter Hall Golf Course. The scope of <br /> work includes drainage improvements, grading, and placement of base course,curbing and placement of <br /> asphalt. The Parks Department received three bids. The bids ranged from $800,000.00 to $2,250,000.00. <br /> The lowest responsive bidder was Advanced Construction, Inc. of Mukilteo, WA. <br /> Base Bid Alternate 1 will be the basis of the contract. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award Contract to Advanced Construction, Inc., in the amount of$800,000.00 plus Washington State Sales <br /> Tax for the Walter E Hall Golf Cart Path Improvements and authorize the Mayor to sign a construction <br /> agreement with Advanced Construction,Inc. <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.