My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/10/11 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/10/11 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 10:16:27 AM
Creation date
3/1/2017 10:14:37 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/11/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Roth Hill Engineering Partners, LLC <br /> R o t h H i l l 2600 116th Avenue NE, Suite 100 <br /> Bellevue, Washington 98004 <br /> Tel. 425.869.9448 <br /> MEMORANDUM 800.835.0292 <br /> Fax 425.869.1190 <br /> EXHIBIT A-1 <br /> TO: City of Everett Public Works Department <br /> Dave Voigt, PE <br /> FROM: Erik Waligorski, PE <br /> RE: Sewer System "I" Replacement <br /> Scope & Budget for Additional Sewer Main Replacement <br /> COPIES: File Project No: 67-002 <br /> • <br /> DATE: September 22, 2006 Page 1 of 2 <br /> Roth Hill is pleased to submit the following scope and budget in the amount of $17,600 for the <br /> additional sewer main replacement work for the City of Everett as requested at our meeting on <br /> Monday, September 11, 2006. The additional scope of work includes the replacement of side <br /> sewers in the 1300 block of Oakes; the sewer main and side sewer replacement in the 1400 block <br /> of Oakes and on 15th Street from Oakes east to the next alley; and the sewer main and side <br /> sewer replacement in the 1500 block of the Oakes/Lombard Alley. This work adds approximately <br /> 1,620 lineal feet to the Sewer System "I" Replacement Project. Following is a list of tasks and <br /> estimated budget increases required to accomplish the additional work: <br /> Utility Research & Coordination (Task 1) <br /> This task will consist of obtaining required as built records of utilities in the vicinity of the additional <br /> work. This task will also consist of the coordination with the utility locating subconsultant to have <br /> the area marked for topographic surveying and will include the cost of the utility subconsultat. <br /> Total Labor Reimbursables Consultants TOTAL <br /> Planned Hours Planned Cost Planned Cost Planned Cost Cost <br /> 8 _ $938 $162 $1,500 $2,600 <br /> Onsite Design Survey(Task 2) <br /> This task will consist of the topographic surveying of the area required to design the additional <br /> 1,620 feet of sewer replacement. The surveying will also include setting reference points to be <br /> used during the construction process and the preparation of a base map per the original scope of <br /> services and contract agreement dated March 27, 2006. • <br /> Total Labor Reimbursables Consultants TOTAL <br /> Planned Hours Planned Cost Planned Cost Planned Cost Cost I . <br /> 68 $7,840 $860 $0 $8,700 <br /> 16 F:\0067\00002.100\Pr1Mgmt#25790\Corresp\OwneAdv_091706_ejw_memo_Additional Scope&Budget.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.