My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/10/25 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/10/25 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 10:38:25 AM
Creation date
3/1/2017 10:38:05 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/25/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br /> Amendment No. 8 to the Department of Ecology's <br /> Remedial Action Grant Agreement No.G0200099 <br /> with the City of Everett <br /> All sampling data shall be submitted to the DEPARTMENT in both printed and <br /> electronic formats in accordance with WAC 173-340-840(5) and the DEPARTMENT'S <br /> Toxic Cleanup Program Policy 840: Data Submittal Requirements. <br /> 6. PROJECT TASK: WELL ABANDONMENT <br /> Maximum Eligible Cost: $10,000 <br /> Schedule: December 31,2006 <br /> Project Description: <br /> The RECIPIENT shall abandon wells no longer used in the initial investigation and within <br /> the landfill footprint. Five wells within the landfill (MW 5, 8, 14, 23, and 32) shall be <br /> abandoned per WAC Chapter 172-160. MW 21 shall be abandoned and replaced. <br /> 7. PROJECT TASK: TEMPORARY ACCESS ROAD GAS MONITORING <br /> Maximum Eligible Cost: $10,000 <br /> Schedule: December 31, 2006 <br /> Project Description: <br /> The RECIPIENT,per the approved Compliance Monitoring and Contingency Plan,will <br /> provide gas monitoring of the access road. This task includes the initial gas monitoring of <br /> 41st Street Overcrossing roadway after completion, as required by the DEPARTMENT with <br /> the intent of validating the construction methods. <br /> C. The Budget and Fund Sources are hereby deleted and replaced with the following, which <br /> redistributes existing funding and provides additional funding where needed. <br /> BUDGET <br /> Project Task Maximum Eligible Cost <br /> 1. Shallow Aquifer Sampling $130,000 <br /> 2. Perimeter Gas Control Systems 1,625,000 <br /> 3. Administration and Management 80,000 <br /> 4. Landfill Gas Controls and Barriers for Landfill Roadways 1,033,144 <br /> 2 of 4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.