My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006/11/15 Council Agenda Packet
>
Council Agenda Packets
>
2006
>
2006/11/15 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2017 11:54:08 AM
Creation date
3/1/2017 11:53:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
11/15/2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.Milt1* WAS C.®U I% 3D�:� ® '`E°.1 - ' - <br /> , �. r .� - ` ' tet., �. � d '`'ti 'Fcv �• t `, ^ffA ° '•'dh� uF <br /> -5,1�-`4.1.4sfe�rver�.�n. a, ��� �xi"'P� lJt <br /> PROJECT TITLE: <br /> Request for Qualifications Consent COUNCIL BILL# <br /> from Design and X Action Originating Department Transportation Services <br /> Development Consultants First Reading Contact Person Tom Hingson/Richard Tarry <br /> for Preliminary Second Reading Phone Number (425) 257-8939 <br /> Engineering for the Swift Third Reading FOR AGENDA OF November 15, 2006 <br /> Bus Rapid Transit(BRT) Public Hearing <br /> Northern Terminal at Initialed by: <br /> Everett Station. Department <br /> Head Aft F' <br /> CAA <br /> Council <br /> President <br /> Location Preceding Action Attachments Department(s) Approval <br /> In the vicinity of Budget 10-25-2006 Swift Bus Rapid <br /> Everett Station Transit(BRT) <br /> Northern Terminal at <br /> Everett Station <br /> Amount Budgeted -0- <br /> Expenditure Required -0- <br /> Budget Remaining <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> This action is a Request for Qualifications (RFQ) to identify a consultant to provide Preliminary Engineering <br /> (PE) for the northern terminal in the Everett Station area for the Community Transit(CT) SR99 `Swift' Bus <br /> Rapid Transit(BRT) line. The work will include reconfiguring the existing roadway, sidewalk, landscaping, <br /> and utilities at the existing site to accommodate a new BRT terminal consisting of 2-4 BRT vehicle bays, <br /> shelters,lighting, landscaping,real-time bus arrival signs,off-board ticket vending machines and other <br /> station amenities to support the new `Swift' BRT line. <br /> Everett Transit has applied for WSDOT grant funds for$1.9 million for Final Design and Construction.ET is <br /> partnering with CT and funding the PE for this station from local funds. <br /> RECOMMENDATION: Authorize staff to advertise for Request for Qualifications from Design and <br /> Development Consultants for Preliminary Engineering for the Swift Bus Rapid Transit(BRT)Northern <br /> Terminal at Everett Station. <br /> RIhIAI/120804 NETC RFQ Request <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.