Laserfiche WebLink
9. Lack of comment on the plans submitted with the application does not constitute <br /> approval of these plans. <br /> 10. City streets and alleys are to be kept clear of dirt and debris at all times during <br /> construction. Dust suppression and street cleaning must occur as directed by the <br /> Public Works Inspector. <br /> 11. Any broken or damaged sidewalk shall be repaired or replaced per the City Public <br /> Works Inspector's direction in the field. <br /> 12. Temporary erosion control measures for construction activity must be operational <br /> prior to commencement of any clearing or earthwork. <br /> REVII # 14-015 <br /> Page //i <br />