My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE FARMERS MARKET 2025-07-24
>
Address Records
>
GRAND AVE
>
2900
>
FARMERS MARKET
>
2900 GRAND AVE FARMERS MARKET 2025-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:41:08 AM
Creation date
3/2/2017 8:31:37 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
FARMERS MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 3 <br /> 5/14/2015 9:39 <br /> Issued By WMW WARD,MICHAEL W. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 5/8/2014 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 664 <br /> Program <br /> Title SO SIX INCH 2920 GRAND AVE 710119664 <br /> Work Order No 20141117 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 5/8/2014 Time 12:58 Original WO Billing <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> ✓ J0055 01 FORD 1 1/2 TON SERVICE TRUC 2 20.6 05/19/2014 <br /> ✓ J0049 2000 FORD 1 1/2 TON SERVICE TR 2 20.6 05/19/2014 <br /> ✓ J0034 1999 FORD 1 1/2 TON SERVICE TR 2 19.6 05/28/2014 <br /> ✓ J0049 2000 FORD 1 1/2 TON SERVICE TR 2 19.8 05/28/2014 <br /> Total Vehicle Cost $80.60 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M MEGA44044447 MEGALUG 6 KIT 1 34.101 05/19/2014 PM <br /> M SLEE50061847 SLEEVE TAP 12 W/6 FLG TAP STAINLESS 12.90-13.30 1 505.596 05/19/2014 PM <br /> M VALV44040448 VALVE GATE 6 MJ X FLG DI W/OP NUT 1 525.108 05/19/2014 PM <br /> M ADAP44031247 ADAPTER 6 FLG X 6 DI 6.63-6.90 FLANGED COUPLING RFCA 2 424.398 05/28/2014 PM <br /> M METE44142647 METER 6 NEPTUNE COMPOUND TRU-FLOW W/PRO READ(IN CU FT) 1 4722.9 05/28/2014 PM <br /> M PLUG38108447 PLUG 2 NPT BRASS W/RAISED SQUARE 2 20.286 05/28/2014 PM <br /> M SPOO44152247 SPOOL 6 FLG METER TEST(USE WITH COMPOUND METER) 1 586.327 05/28/2014 PM <br /> M STRA44153347 STRAINER 6 FLG METER NEPTUNE(USE WITH COMPOUND METER) 1 1505.335 05/28/2014 PM <br /> 0 <br /> M SUPP44146047 SUPPORT PIPE 6"ADJUSTABLE PIPE SUPPORT 2 186.436 05/28/2014 PM <br /> Total Material Cost $8,510.51 ' ' <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 6 IN FLG KIT 1 10.82 05/19/2014 <br /> NA N/A TAP FEE 1 150 05/19/2014 <br /> NA N/A 6 IN FLG KIT 4 43.28 05/28/2014 <br /> Total NA Cost $204.10 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> <br /> <br /> <br /> <br /> <br /> <br /> Total Personnel Cost $289.67 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.