My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2900 GRAND AVE FARMERS MARKET 2025-07-24
>
Address Records
>
GRAND AVE
>
2900
>
FARMERS MARKET
>
2900 GRAND AVE FARMERS MARKET 2025-07-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 8:41:08 AM
Creation date
3/2/2017 8:31:37 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
2900
Tenant Name
FARMERS MARKET
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIMgk MI31FITMENT <br /> t4Utilities Division,3200 Cedar Street = _ _ <br /> �� `syz .__Fid MAS <br /> EY Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $28,368.00 Service Order# <br /> Contact Person Lopsang Dargey Telephone# 425-877-8175 <br /> Requested By Gordon Witcher Date of Request 4-7-14 <br /> Property.Own�r(name) PathAmerica LLC <br /> R <br /> Charge Cost to(name if different than owner) <br /> Address PO Box 13261 City Everett Zip 98206 <br /> Installation Location 2920 Grand Ave <br /> Installation type/description/size/etc. Complete 6" meter installation. Contractor to do restoration. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material . 14,977. cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits 9,153. Gordon Witcher <br /> Equipment Rental 3,750. MattWelborn <br /> � Mike Ward <br /> Tax 488. Randy Allen <br /> Paul McKee <br /> TOTAIi $28,368. <br /> y: re <br /> Pre aced b Mike Ward Date Estimate Prepared 4-18-14 <br /> p 'GG P <br /> Accepted by: ,Uw fji `j%, Representing Pa-r /4 hi r 6 <br /> T G ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2o14\ <br /> `� <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.