Laserfiche WebLink
i , 4./24(1 <br /> Paul McKee <br /> From: Joe Zlab <joe@dargey.com> <br /> Sent: Tuesday, April 21, 2015 2:25 PM <br /> To: Steve Ingalsbe; Steve Ingalsbe <br /> Cc: Paul McKee <br /> Subject: Narrative Statement for building changes <br /> Hi Steve, <br /> I have the narrative statement and building renderings underway. The artists will take a few more days up to 10 days. I'm <br /> holding on our glass order and our sidewalk work for a bit for this and it is going to be delaying our building some. In order to <br /> minimize this, can we at least agree to the sidewalk? IE, Decorative metal tree grates, bronze letters for street names, city <br /> standard scoring with standard colors except for at plaza. At plaza,we will submit colors same as permit set with scoring <br /> slightly changed to better match city standards. <br /> If this seems reasonable, I'd like to at least free up the contractor to do the city standard sidewalks while we wait in the <br /> architect for the plaza area. <br /> Thanks and best regards, <br /> Joerut , <br /> LA/ Air <br /> k,(Ao <br /> Joe ab, PE,SE �/' <br /> nab, 141 President of Construction G i C r/ <br /> Goo i � � < (a (� <br /> o.425.200.0348 diC <br /> i <br /> Gt ,A�� <br /> C.425.876.7305 ,c <br /> ; �/ N Pr' 1 <br /> joe@dareev.com J r L'v <br /> www.dargev.com 1- D ((�li <br /> C.31 g <br /> i.� 5.,► <br /> DARGEY �'� aIJ(,� <br /> \:',..,..__•___/)" DEVELOPMENT ,('-v 1 <br /> �r 1 <br /> 1 <br />