My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4726 HARBOR LN 2017-03-02
>
Address Records
>
HARBOR LN
>
4726
>
4726 HARBOR LN 2017-03-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2017 8:58:46 AM
Creation date
3/2/2017 8:58:39 AM
Metadata
Fields
Template:
Address Document
Street Name
HARBOR LN
Street Number
4726
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 6/10/2015 <br /> 01011, Public Works Permit#: PW1506-014 <br /> City of Everett Public Works Department Building Permit#; C1506-001 <br /> Avg TT 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public.Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> FLEMING MARK& JING SUN FLEMING MARK&JING SUN <br /> 4726 HARBOR LANE 4726 HARBOR LANE <br /> EVERETT WA 98203 EVERETT WA 98203 <br /> PHONE: 4255308791 PHONE: 4255308791 <br /> TAX PARCEL ID# 0041 71 00001 300 SITE ADDRESS: 4726 HARBOR LN <br /> DESCRIPTION OF PROPOSED WORK: <br /> ADD GARAGE & REMODEL ENTRY <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. City records indicate a section of this building's side-sewer will be under the footprint of the proposed building. <br /> Replacement of the side sewer pipe material or rerouting will be necessary to meet the uniform plumbing code. w <br /> 5. Driveway width to be a Maximum of 20'wide per City Planning Department. )-1 <br /> C/) <br /> 6. It is the applicant/owner's responsibility to ensure that stormwater runoff from new impervious surfaces will be 4 <br /> managed on-site in a manner that does not adversely affect neighboring properties, including the City's right-of-way Q <br /> and/or easements and the improvements located therein. '' <br /> 7. Keep City streets clean at all timesC.Z <br /> 8. The existing strip of asphalt around the street catch basin is to remain. Review with Public Works Inspector. [--I <br /> CA <br /> 9.No stacking of materials will be allowed on the public right of Way. 0 <br /> 4.1 <br /> 10. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction <br /> and with other inspection requests. <br /> Driveway$25 <br /> Plan Review$20 TO POSTING /' 1 / / �1 ACKNOWLEDGEMENT OF CONDITIONS <br /> Inspection $20 ' The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> `----/A�,z�c /�Z:2 2_ 6 -70-4 or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> Approved for Construction Date public property damaged thereby. <br /> )8 <br /> FINAL INSPECTION Date 1 .- - - 15-- <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.