Laserfiche WebLink
/ V -NT- \ <br /> GENERAL NOTES: KEY NOTES: <br /> SYMBOL DESCRIPTION 1 <br /> 1. ALL DETAILS ARE SHOWN IN GENERAL TERMS. O CADWELD (TYP.) SEE SHEET E-4. <br /> ACTUAL INSTALLATION AND GROUND ROD NOTES: <br /> ® COPPER GROUND ROD CONSTRUCTION MAY VARY DUE TO SITE SPECIFIC CONDITIONS. 2 GROUNDING GR GROUND BAR(VAT SEE ASE11 E-4. E 0 0 O ®b I7' �U® <br /> O SECTOR AT ANTENNAS TIED INTO EXISTING VVV WWW//(///JS <br /> 2. GROUND ALL ANTENNA BASES, FRAMES, CABLE RUNS,AND OTHER METALLIC 1. ELECTRICAL CONTRACTOR SHALL ORDER GROUND RESISTANCE TESTING ONCE (! <br /> CADWELD COMPONENTS USING GROUND WIRES AND CONNECT TO SURFACE MOUND GROUND SYSIEM HAS BEEN INSTALLED;A QUALIFIED INDIVIDUAL, UTILIZING <br /> • BUS BARS. FOLLOW ANTENNA AND BTS MANUFACTURER'S PRACTICES FOR THE FALL OF POTENTIAL METHOD, SHOULD PERFORM THE TEST.THE REPORT O3 MAIN SITE EQUIPMENT GROUND BAR TIED INTO EXISTING <br /> GROUNDING REQUIREMENTS. GROUND COAX SHIELD AT BOTH ENDS AND EXIT WILL SHOW THE LOCATION OF THE TEST AND CONTAIN NO LESS THAN 9 TEST EXTERNAL GROUND RING (V.I.F.) SEE SHEET E-4. <br /> • EXOTHERMIC WELD FROM TOWER OR POLE USING MFR'S PRACTICES. POINTS ALONG THE TESTING UNE, GRAPHED OUT TO SHOW THE PLATEAU. ® #6 AWG JUNCTION BOX GROUND TO MAN GROUND BAR <br /> 3. ALL GROUND CONNECTIONS SHALL BE CADWELD.ALL WIRES SHALL BE 2. POINT GROUND TEST OR 3 POINT 62%TESTS WILL NOT BE ACCEPTED AS (TYP). SEE SHEET E-4. <br /> ® TEST WELL AEDVE PPR G OUND HWN. ALL GROUND WIRE SHALL BE GREEN INSULATED WIRE PERFO MED WHIILTOE HH COUNERPOE AFORE ISEED GROUND TESTS.TEST SHALL BE <br /> IS ISOLATED FROM THE A/C SYSTEM OS #6 AWG EQUIPMENT CABINET GROUND TO EQUIPMENT <br /> GRIDS AND EXISTING COMMUNICATIONS FACILITY. GROUND BAR (TYP). SEE SHEET E-4. I <br /> GROUND BAR 4. CONTRACTOR TO VERIFY AND TEST GROUND SOURCE. GROUNDING AND OTHER <br /> OPERATIONAL TESTING WILL BE WITNESSED BY CARRIER. REPRESENTATIVE. © #6 AWG ANTENNA/RADIO MOUNT GROUND TO SECTOR <br /> GROUND BAR (TYP). SEE SHEET E-4. <br /> ,."---""s, GROUND WIRE 5. REFER TO DIVISION 16 GENERAL ELECTRIC; GENERAL ELECTRICAL PROVISION <br /> AND COMPLY WITH ALL REQUIREMENTS OF GROUNDING STANDARDS. Oj #6 AWG RRH MOUNT GROUND TO SECTOR GROUND BAR Glotel. <br /> 1 <br /> (TYP). SEE SHEET <br /> -- #2 AWG GROUND RING 6. ELECTRICAL CONTRACTOR TO PROVIDE DETAILED DESIGN OF GROUNDING AWG H-FRAME/ICE BRIDGE POST GROUND TIED INTO <br /> SYSI EA,AND RECEIVE APPROVAL OF DESIGN BY AUTHORIZED CARRIER, ® #6 + + TM <br /> REPRESENTATIVE. PRIOR TO INSTALLATION OF GROUNDING ST'SIEM. PHOTO EXTERIOR GROUND RING (VIE.),TYP EACH POST. >Integrity Delivered <br /> FIELD VERIFY& TIE INTO DOCUMENT ALL CADWELDS AND GROUND RINGS. SEE SHEET E-4. <br /> EXISTING GROUNDING STSI LM 6 AWG PENDANT GROUND TO SECTOR GROUND BAR nP <br /> 7. NOTIFY CONSTRUCTION MANAGER IF THERE ARE ANY DIFFICULTIES INSTALLING 0 S (TYP). J <br /> GROUNDING SYSTEM OUE TO SITE SOIL CONDITIONS. SEE SHEET E-4. <br /> o B. USE PANI SCHEME FOR LOADING GROUNDS ON MGB AS DISCUSSED IN NSTD ® #6 AWG CUBE GROUND TIED INTO EXISTING GROUNDING NOTE:119. 33 & 36. SYSTEM (VIE.) SEE SHEET E-4. GROUND HYBRID CABLES TOP & BOTTOM USING REDS VERSION 6 <br /> m UNIVERSAL 1-5/8"GROUNDING STRAP, PART #252172 <br /> T a #225TE AWG <br /> PPC <br /> (V F.) OUNEEDHTIEED INTO EXISTING GROUNDING <br /> -4. <br /> t, - GROUNDING#2 AWG CH LIGHT GROUND ST81 tM (V.I.F.)SEE TIED <br /> SHEEETO E-45TING <br /> N CASCADE HS/ <br /> V .., , ./. x i �� 1\ j/ SNO—PUD/ <br /> a���, � <br /> w GRACE <br /> cli vQ r�G <br /> h SE01610C <br /> P II III Qo <br /> ® G a <br /> 5 ' v ° 8401 HOLLY DR <br /> EVERETT,WA 98208 <br /> u _ C v SNOHOMISH COUNTY <br /> 3 • _ <br /> PP.O o Q p 4 <br /> z 'Ilk I ilill r 04-27-2021 <br /> TVP 0 `T` �nP. ` / ID <br /> JUL <br /> ',:4 l‘0 - - 4 <br /> �� .• �0 <br /> Q <br /> iL <br /> 0 2,..., Tn ' Z©ce ` / <br /> L . . , , <br /> 0 <br /> t5e•—i•/50•-1•AGL RID CENTER a I a��•FGI SIE" <br /> /:‘ <br /> p �S/ONAL !1, <br /> NG <br /> z TYP. <br /> m ■ �P0 I�I \ EXPIRES 01-09-2022 J <br /> li <br /> • <br /> © REVISIONS <br /> a — <br /> REE V. DATE DESCRIPTION BY <br /> O_ <br /> D. <br /> ® , A 03/31/21 ISSUED FOR SOT CD REVIEW AF <br /> N 11". . I \ TYP. 0 04/23/21 ISSUED FOR IOOT CONSTRUCTION AF <br /> w <br /> TYP. <br /> z <br /> it !/ :r►�4 <br /> �♦ ♦. . J <br /> s 0- / VII <br /> o 0 TYP. ; <br /> 0 �jt TITLE <br /> `� I SCHEMATIC GROUNDING PLANS <br /> AEHC ACIDS ANTENNAIRADIO PLAN RRH PLAN <br /> K *51•-1•AGL RID CENTER *47•-0•Ail MOUNT HEIGHT <br /> IIw <br /> SHEET <br /> z / <br /> z <br /> Z N <br /> N <br /> 2 iJ►_ <br /> E-3 <br /> l <br /> ..i ;�'` <br /> 2 <br /> TRUE NORTH TRUE NORTH <br /> LX 24"e36"SCALE: 1/2" = 1'-0• I I 24%36" SCALE: 1/2" = 1'-0" I I #: TGi61 <br /> \1".n"SCALE: 1/4" = 1'-0" 2' 1' o• 2' ANTENNA SCHEMATIC GROUNDING PLAN 12 11",17" SCALE: 1/4" = 1•-0" 2' 1' O" 2' EQUIPMENT SCHEMATIC GROUNDING PLAN I 1 GLOTEL PROJECT <br /> J <br /> Iq 7.0 <br />