My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1026 LOMBARD AVE 2018-01-22
>
Address Records
>
LOMBARD AVE
>
1026
>
1026 LOMBARD AVE 2018-01-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2018 7:13:55 AM
Creation date
3/3/2017 7:59:29 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1026
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
#1111. 4 4 <br /> r--4Neyett blie Works <br /> 3200 Cedar St, Everett, WA 98201 <br /> E4RETT Permit Services: (425)257-8810 <br /> JULY 12, 2016 <br /> Shear nailing correction completed, exterior only. Ok to cover siding. <br /> Interior later on framing. <br /> 11/18/15 PlbgRoughln PartialApproval See notes <br /> Upstairs apartment and downstairs bathroom (north). <br /> 11/18/15 Framing PartialApproval See notes <br /> Phase I -framing OK to cover(insulate) <br /> Phase II -framing - bathroom, laundry only, OK to cover(insulate). <br /> Partial approval: Need Mechanical rough in before cover. <br /> 11/19/15 MechRoughln PartialApproval See notes <br /> 1) Downstairs bath & laundry, correct tight 90 degree's at fan box. <br /> 2) Upstairs Apt, OK to cover. <br /> Range hood exhaust at Final. <br /> OK to proceed with this phase. <br /> 12/1/15 InsulBldg Approval See notes <br /> Insulation OK to cover(drywall). <br /> Note: Provide a copy of Insulation Certificate at Building final, insulation installed in walls & ceiling, R- <br /> -values. <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.