Laserfiche WebLink
5/2/2017 Pag� 1 <br /> City of Everett <br /> 8:35:54A:VI <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C 1602-002 Site Address 5622 LOWELL RD <br /> Applied 2/2/2016 Applicant OWNER Lot <br /> Approvcd 2/10/2016 Owner ADKINS ALAN&MOORE MELODY Block <br /> Issued 2/19/2016 Contractor OWNER Tract <br /> Parent Permit No. Description ADD F3ATHROOM&CLOSE'I"I'O MASTER BCDROOM <br /> tiotes PLnNNING TO DO�INAL INSP PRIOR TO CO <br /> Rcquested Scheduled Result <br /> Time/By Completed Inspection Type Inspector Remarks Notes <br /> 7/11/2016 7/1 I/2016 PlbgWaterLine SUP Othcr (7/I I/20162:32 PM SDP) <br /> 1426 SDP 7/I I/2016 Spoke H•ith Alan on the phone concerning <br /> his water service line. I�le currently has a <br /> 3/4"service.By adding an additional <br /> bathroom,his lixturc count rises to 24.5. <br /> I'his puts him 4.5 l�U's over for a 3/4" <br /> scrvice. I waved this rcquiremen[as it <br /> would be a substantial cost to replacc his <br /> water service.Street pressure at the ncarest <br /> hydrant is 73 PSI. <br /> 7/18/2016 7/18/2016 Footin� KMK Approval <br /> 16:38 MTM 7/]8/2016 OK to pour <br /> 8/3/2016 8/2/2016 Undcrfloor KMK Approval <br /> 10:47 CRB 8/2/2016 UNDERFLOOR FRAMING OK <br /> 8/18/2016 8/18/2016 ShearNailing UW1= Approval <br /> 15:08 SDC 8/18/2016 As per plans,ok to covcr(siding) <br /> ]0/13/2016 10/13/2016 McchRoughln DXW Approval 1 cxhaustfor bath,rough in Ok as notcd- <br /> 16:05 MTM 10/13/2016 Sec notcs complete 3 tt ol�duct. <br /> 10/13/2016 10/13/2016 PlbgRoughln DXW Approval <br /> 16:0� M"1'M 10/13/2016 <br /> 10/13/2016 10/l3/2016 PlbgGrWork DXW Approval <br /> 16:0� M�I�M 10/13/2016 <br /> 10/14/2016 10/14/2016 I�raming UWI� Approval <br /> 1639 MTM 10/14/2016 OK to cover(insulatc) <br /> 10/17/2016 10/17/2016 DrywallNailing DWI' Approval <br /> 1623 MTM 10/17/2016 OK to cover(mud/tapc) <br /> 10/17/2016 10/17/2016 lnsull3ldg I�WF Approval Insulation approvcd as noted. Contractor to <br /> I G23 vl'fM 10/17/2016 Sec notes "air seal"platc lincs&wall comers as <br /> discussed. <br /> 12/]2/2016 12/12/2016 Pinal Plbg SDP Approval <br /> 15:56 SDC l2/12/2016 <br /> 12/12/2016 12/12/2016 Final Mech SDY Approval <br /> 15:56 SDC l2/12/2016 <br /> 12/29/2016 l2/28/2016 Mark Iinal** DWF Approval <br /> 09:09 KMG l2/28/2016 <br /> 12/29/2016 12/28/2016 Final Blde DWF Approval <br /> 08:47 KMG 12/28/2016 No planning department final required <br /> WSP_DETAILS �'""��� <br />