Laserfiche WebLink
Change Order Cover Sheet/For Internal City Use Only <br /> 4 <br /> CONTRACT TIME <br /> Original Contract Duration Working Days ❑ Calendar Days ® 90 <br /> Date of Notice to Proceed 9/5/2006 <br /> Cumulative adjustment to duration by prior Change Orders 0 <br /> Adjustment to duration by this Change Order 60 <br /> New Contract Duration (including this Change Order) 150 <br /> EXPLANATION/JUSTIFICATION <br /> Construction of Garfield Park Improvements is approximately 50%complete. A water main, not identified on the construction <br /> drawings, was discovered during construction. It runs through the west end of the park. This requires the relocation of the <br /> park's entry columns, redesign of the plaza and landscape bed, thereby increasing the project's cost for concrete, landscape <br /> curbing and demolition costing in the amount of$15,450. The entry columns in the four corners of the park also needed <br /> additional structural support for the artwork and arch, in the amount of$9,250. There are sufficient contingency funds in this <br /> project to pay for this work. <br /> Under separately planned improvements funded out of program 52, the parks department programmed 1) the replacement of <br /> the deteriorated 4' baseball field fencing with 6' fencing and additional fencing to prohibit vehicle access to the interior of the <br /> park; and 2) convert the existing parking on the south side of the park(15 '/2 feet in length) to city of Everett standards (18 1/2 <br /> feet in length) including new curbing, asphalt and fence line relocation (which will reduce mowing maintenance. Staff conferred <br /> with purchasing and determined adding these two items to the existing scope of work is consistent with the original contract's <br /> scope. Staff believes that adding these additional elements will be less costly than undertaking them outside of the current <br /> construction project(in part because a contractor is already mobilized). The cost of these elements are $23,500 and $44,200 <br /> respectively, plus Washington State Sales Tax. <br /> Contract time has been extended due to additional work and extreme weather conditions in November, causing extensive <br /> delays in construction. <br /> CityStaff Contact: Jonna Hauser <br /> 17 <br /> Date: 11/28/2006 <br />