Laserfiche WebLink
CITY OF EVERETT <br />4 FINAL CONTRACT VOUCHER CERTIFICATION <br />CONTRACTOR: R.L. Alia Company ADDRESS: 107 Williams Ave S <br />CITY: Renton STATE: WA 98055 DATE: December 6, 2006 <br />PROJECT TITLE: Lift Station #36 Modifications WORK ORDER NO. 3086 <br />DATE WORK COMPLETE: November 16, 2006 FINAL AMOUNT: $ 358,346.46 <br />CONTRACTOR'S CERTIFICATION <br />I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br />and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br />authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br />employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br />monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br />understand the same and t I hereby release the City of Everett from any and all claims of whatsoever nature which <br />I may have, arising out f t performance of said contract, which are not set forth in said estimate. <br />X X � <br />PI��Io�A,T <br />R.L. R <br />AIia Company TITLE <br />y Q. <br />e,Q••.•�pTAgy. r <br />Subscribed and sworn to before = : My comm. Expires Z _ <br />August 25,2007 <br />o /n . Omet drµ dayz <br />X .Notary Public %��' • 't'UBL��' 0 <br />in and for the tate of Washington, residing at K &"4 (�av2x�� <br />i'OF I * \-\ <br />II <br />PUBLIC WORKS DEPARTMENT CERTIFICATION <br />I Certify the attached final APPROVED Date: <br />estimate to be based upon actual <br />measurements and to be true and correct. <br />X % X <br />Construction Manager Utilities Director <br />Tom Fuchs Tom Thetford <br />INSTRUCTIONS <br />The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br />agents and forwarded with the Final Contract Voucher Certification. <br />Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br />attached. <br />Revised 9/94 <br />7 <br />