My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/01/03 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/01/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 8:32:00 AM
Creation date
3/6/2017 8:31:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/3/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AAENDA ITEM COVER SHEET <br /> PROJECT TITLE: 6 <br /> Change Order No. 1 to the XX Consent COUNCIL BILL# <br /> Water Pollution Control Action Originating Department <br /> Facility Expansion Phase A First Reading Contact Person Tim Marks <br /> Project with Hoffman Second Reading Phone Number 7860 <br /> Construction Company for a 90 Third Reading FOR AGENDA OF Jan 3, 2007 <br /> day extension to the contract. Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA _vs <br /> Council President t <br /> i. <br /> Location Preceding Action Attachments Department(s) Approval <br /> WPCF on Smith Island Executed contract 2-17- Change Order <br /> 05 <br /> D Amount Budgeted g $40,956,477. (includes WSST) <br /> Expenditure Required None Account Number(s): UP-2993-40 <br /> Budget Remaining $0 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> Hoffman Construction Company is currently completing work on the Water Pollution Control Facility <br /> Expansion Phase A. Additional time is needed to complete the contract work as a result of late equipment <br /> and material deliveries. There were also difficulties commissioning the new disinfection system. In addition <br /> to the items above, a pump failure during startup requires additional time to implement corrective measures. <br /> Hoffman has requested a no cost, 90 day extension to the construction contract to complete all work <br /> identified in the contract. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 1 to the Water Pollution Control Facility Expansion Phase A <br /> construction contract with Hoffman Construction Company for a 90 day extension to the contract with no <br /> cost to the city. <br /> 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.