My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/01/03 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/01/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 8:32:00 AM
Creation date
3/6/2017 8:31:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/3/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� �. �� � � � ��E����T"IGI�.� COQ ¢�: � ��� .:��. �� � ���. <br /> it �- 0 4t k r t ru X71 Iy AmSin I intmo�BR S`<' Dw q ‘4'1 <br /> qtr;"1.`'�£ ��a' ' F� ' ,�F"�,. „r � �V'�'�y�6'��4�;�?sz�'.�'2.�_ d��@1� # �}�.-x&;�w�}��!ti'?�.-. 7 �t � -��-�-�'ni ",�'�'m '",1-ax�' , <br /> u .gm3;.,.«.: ..SY t ".4 n..�0.�a'�v.i � _...&,.wet kk�``.w `„a"'SF"`+'�..,ti`tsix-s.°+�4..'„",,:�k',�r'n"'� 4` "s"au' 'kztt" , „ ti t� ��.1 sia1T <br /> PROJECT TITLE: 8 <br /> Local Agency Haul Road/ Consent COUNCIL BILL# <br /> Detour Agreement with X Action Originating Department Engineering <br /> WSDOT for detour routes First Reading Contact Person Ryan Sass <br /> while Evergreen Way, Everett Second Reading Phone Number 257-8942 <br /> Mall Way, and South Third Reading FOR AGENDA OF 1/03/07 <br /> Broadway, from 112th St SW to Public Hearing <br /> SR 526 are under construction. Initialed by: <br /> Department Head ��W <br /> CAA <br /> Council President ei� <br /> Location Preceding Action Attachments Department(s) Approval <br /> Evergreen Way, Everett Local Agency Haul Legal, Utilities <br /> Mall Way, and South Road/Detour Agreement <br /> Broadway from 112th St. HRD 1-0345 <br /> SW to SR 526 <br /> Amount Budgeted N/A <br /> Expenditure Required N/A Account Number(s): <br /> Budget Remaining N/A <br /> Additional Required N/A <br /> DETAILED SUMMARY STATEMENT: <br /> The Washington State Department of Transportation (WSDOT) will be constructing a hot mix asphalt <br /> overlay of SR 99 from 112th St. SW to SR 526. This project is expected to begin in May 2007 and last <br /> through August 2007. The attached agreement identifies the proposed detour routes on Evergreen Way, <br /> Everett Mall Way, and South Broadway that will be used during this construction project. <br /> This agreement also includes reimbursement from WSDOT if additional maintenance to adjoining streets is <br /> required as a result of this project. <br /> City staff has participated with WSDOT in developing the detour routes for this project and to minimize <br /> construction impacts during peak travel hours. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign the Local Agency Haul Road/Detour Agreement with WSDOT for detour routes <br /> while Evergreen Way, Everett Mall Way, and South Broadway, from 112th St SW to SR 526 are under <br /> construction. <br /> 7 <br /> SR 99 Detour Aereement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.