Laserfiche WebLink
INSPECTION REPORT <br /> Date: 174/1U 1(Q Permit: E..4�j 10 - f O9 <br /> 4 Contractor: t\rcu&t i . <br /> 0 100 Owner: 1(4.41...— <br /> 49 <br /> Site Address:3r)_a L OcL S ' — <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑ Ceiling Grid <br /> ❑dough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑ ervice ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration Cl Rough In <br /> ❑Roof drains , ❑BuildingldQFinal ❑Gas Pipe Final ❑HWT Final <br /> -IER OR CONSULTATION.tl)70 . a200 <br /> IS ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P R <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ] UNABLE TO PERFORM INSPECTION: <br /> A] CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Qi <br /> Inspect .IL__ Date: <br /> 1l)ItM <br /> � C <br /> EIR(4/09) <br /> /C'h/LaTt Ti'E ti&V ()MOTIONS•325/4811-8900 <br />