Laserfiche WebLink
JP-A- �l r Crin cOUICI 14,\O ENTIV�1[�. M MTE SHIM - - I 3 <br /> PROJECT TITLE: <br /> Casino Tank—Authorization to Consent COUNCIL BILL# <br /> Call for Bids Action Originating Department Public Works <br /> First Reading Contact Person Jim Miller <br /> Second Reading Phone Number 257-8880 <br /> Third Reading FOR AGENDA OF Jan. 17, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA !t`� <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> South of Casino Road at Authorized hiring tank Public Works <br /> 10th Ave West by Walter industries consultant to <br /> Hall Golf Course design new tank <br /> Amount Budgeted 10,400,000. <br /> Expenditure Required 2,000. Account Number(s): <br /> Budget Remaining 10,398,000. <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The existing Casino water standpipe, located adjacent to the northeast corner of Walter Hall Golf Course, <br /> needs to be replaced. A new elevated water tank with a higher elevation for improving pressure in south <br /> Everett has been designed to replace the old standpipe. The new tank project is ready to go out for bids. The <br /> engineer's latest estimate is $9.6 million for construction. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Call for Bids for the construction of the Casino Water Tank. <br /> 9 <br />