My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/01/17 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/01/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 8:57:28 AM
Creation date
3/6/2017 8:56:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/17/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l c' '[E©7 r Vr. O i i c5 r- �j e�r'OMR <br /> ��t�,�� p WEEP' I <br /> PROJECT TITLE: <br /> Sewer System Replacement X Consent COUNCIL BILL# <br /> "F", Schedule C Project, Action Originating Department PW/Utilities <br /> Call for Bids for Construction First Reading Contact Person David Voigt <br /> Second Reading Phone Number 425-257-8983 <br /> Third Reading FOR AGENDA OF Jan 17, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA y <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> See Attached Project Authorization of Project Location Map <br /> Location Map Amendment to the <br /> Professional Services <br /> Agreement for design, <br /> December, 2003 <br /> Amount Budgeted $1,630,000 <br /> Expenditure Required $2,000 Account Number(s):UP 3188 <br /> Budget Remaining $1,628,000 <br /> Additional Required <br /> DETAILED SUMMARY STATEMENT: <br /> Sewer System Replacement "F", Schedule C replaces approximately 4,300 linear feet of deteriorated <br /> combined sewer mains and side sewer connections in the west side of the Port Gardner neighborhood. The <br /> existing mains and side sewer connections are very old and deteriorated which has resulted in increased <br /> repairs and poor reliability. This project will decrease sewer failures and provide increased reliability of the <br /> system. Trenchless (pipe bursting) methods will be used to replace a majority of these sewer lines. <br /> The Professional Services Agreement for the design of this project was approved in December 2003. Design <br /> of Schedules A and B which are in the same general neighborhood, are in progress and anticipated to be <br /> completed by the end of 2007. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize Call for Bids for the construction of the Sewer System Replacement "F", Schedule C Project. <br /> 1 <br /> C:\Documents and Settings\dwilliam\Local Settings\Temporary Internet Files\OLK6D\Swr F Bid Adv CC Agenda Cover(2).DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.