Laserfiche WebLink
CITY OF EVERETT <br /> FINAL CONTRACT VOUCHER CERTIFICATION <br /> CONTRACTOR:Signal Electric, Inc. ADDRESS: P.O. Box 6209 <br /> CITY: Kent STA IL: WA 98064-6209 DATE: December 12, 2006 <br /> PROJECT TITLE: 2005 Signal Improvement Project WORK ORDER NO. PW3226 <br /> DATE WORK COMPLE I'F: November 17, 2006 FINAL AMOUNT: $ 357,794.00 <br /> CONTRACTOR'S CERTIFICATION <br /> I, the undersigned, having first been duly sworn, certify that the attached bill is a proper charge for work performed <br /> and material furnished to the City of Everett, that the same or any part thereof has not been paid, and that I am <br /> authorized to sign for the claimant; that I have not rented or purchased any equipment or materials from any <br /> employee of the City; I further certify that the attached final estimate is a true and correct statement showing all the <br /> monies due me from the City of Everett under this contract; that I have carefully examined said final estimate and <br /> understand the same and that I hereby release the City of Everett from any and all claims of whatsoever nature which <br /> I may have, ari ' out of the performance of said contract, which are not set forth in said estimate. <br /> CON O� R TITLE V icL <br /> Signal Electric, Inc. <br /> Subscribed and sworn to before <br /> me-tljis /5 day of , c. .� .— <br /> %� -- ------ Notary Public <br /> in and for the State of Washington, residing at /c -{-est <br /> PUBLIC WORKS DEPARTMENT CERTIFICATION <br /> I Certify the attached final APPROVED Date: (2-72-7'96 <br /> estimate to be based upon actual <br /> measurements and to be true and correct. <br /> Xa, X �� <br /> Esc – <br /> Construction Manager Utilities Director <br /> Tom Fuchs Tom Thetford <br /> INSTRUCTIONS <br /> The Affidavit of Wages Paid must be prepared by the prime contractor, all subcontractors, and all subcontractor's <br /> agents and forwarded with the Final Contract Voucher Certification. <br /> Contractor's Claims, if any, must be included and the Contractor's Certification must be labeled indicating a claim <br /> attached. <br /> Revised 9/94 1E-71© I /I r 1� <br /> levL J <br /> DEC 2 i 200E J <br /> CITY OF EVERETT 5 <br /> Construction M,l3natiement <br />