My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/01/24 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/01/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:10:32 AM
Creation date
3/6/2017 9:10:04 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/24/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 3 <br /> PROJECT TITLE: <br /> X Consent COUNCIL BILL# <br /> Call For Construction Bids for Action Originating Department Public Works <br /> the South End Interceptor First Reading Contact Person Souheil Nasr <br /> North Segment Sewer Second Reading Phone Number (425) 257-7210 <br /> Protection Project Third Reading FOR AGENDA OF Jan 24, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President k.,; <br /> Location Preceding Action Attachments Department(s)Approval <br /> BNSF ROW, South of Authorization to Sign Public Works <br /> 36th Street, east side of Supplemental Agreement 1 <br /> I-5 to the Professional Services <br /> Agreement with URS <br /> Corporation to Provide <br /> design services for the <br /> South End Interceptor— <br /> North Segment 36-in <br /> Sewer Line Protection <br /> Project. <br /> Amount Budgeted $1,500,000 <br /> Expenditure Required $2,000. Account Number(s): <br /> Budget Remaining $1,450,000. UP 3283 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The"SOUTH END INTERCEPTOR-NORTH SEGMENT SEWER PROTECTION PROJECT"is ready to <br /> advertise for construction bids. This project will protect approximately 350 feet of the existing 36"diameter <br /> sewer Forcemain south of 36th Street. This protection is needed in order to accommodate the construction of <br /> a new BNSF track over the sewer line. This project is estimated to cost about$1,000,000. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the call for construction bids for the South End Interceptor North Segment Sewer Protection Project. <br /> 3 <br /> C:\Documents and Settings\SuClark\Local Settings\Temporary Internet Files\OLK7D\Agenda-Bid Authorization.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.