Laserfiche WebLink
panel to supports using concealed fasteners in side laps. Include accessories required <br /> for weathertight installation. <br /> B. Provide both vented and non-vented panels. Where vented panels are indicated, <br /> alternate every other panel with non-vented panels. <br /> C. Flush-Profile Metal Soffit Panels: Solid panels formed with vertical panel edges and 2 <br /> ribs between panel edges;with flush joint between panels. <br /> 1. Manufacturers: Subject to compliance with requirements, available <br /> manufacturers offering products that may be incorporated into the Work include, <br /> but are not limited to,the following: <br /> a. AEP-Span. <br /> 2. Material: Aluminum-zinc alloy-coated steel sheet,22 guage. <br /> a. Size: 12"nominal width with 2 ribs between panel edges. Provide vented <br /> panels at soffits where indicated. <br /> b. Exterior Finish: 3-coat fluoropolymer. <br /> c. Color: As selected by Owner's Representative from manufacturer's full <br /> range. <br /> 2.7 ACCESSORIES <br /> A. Roof Panel Accessories: Provide components approved by roof panel manufacturer and <br /> as required for a complete metal roof panel assembly including trim, copings, fasciae, <br /> corner units,ridge closures, clips, flashings, sealants, gaskets, fillers, closure strips, and <br /> similar items. Match material and finish of metal roof panels unless otherwise <br /> indicated. <br /> 1. Closures: Provide closures at eaves and ridges, fabricated of same metal as metal <br /> roof panels. <br /> 2. Closure Strips: Closed-cell, expanded, cellular,rubber or crosslinked,polyolefin- <br /> foam or closed-cell laminated polyethylene; minimum 1-inch- (25-mm-)thick, <br /> flexible closure strips; cut or premolded to match metal roof panel profile. <br /> Provide closure strips where indicated or necessary to ensure weathertight <br /> construction. <br /> 3. Backing Plates: Provide metal backing plates at panel end splices,fabricated <br /> from material recommended by manufacturer. <br /> 4. Vented Ridge: Provide vented ridge where indicated. <br /> SEWER LIFT STATION NO.24 REPLACEMENT PROJECT,UP 3313 <br /> Division 7 Thermal and Moisture Protection Page 07411-8 April 2012 <br />