My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3520 PIGEON CREEK RD LIFT STATION 1 2017-03-06
>
Address Records
>
PIGEON CREEK RD
>
3520
>
LIFT STATION 1
>
3520 PIGEON CREEK RD LIFT STATION 1 2017-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 9:12:24 AM
Creation date
3/6/2017 9:12:15 AM
Metadata
Fields
Template:
Address Document
Street Name
PIGEON CREEK RD
Street Number
3520
Tenant Name
LIFT STATION 1
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 3.4 UNDERLAYMENT INSTALLATION <br /> A. Felt Underlayment: Apply at locations indicated below, in shingle fashion to shed <br /> water, and with lapped joints of not less than 2 inches (50 mm). <br /> 1. Apply over entire roof surface. <br /> B. . Apply slip sheet over underlayment before installing metal roof panels. <br /> C. Install flashings to cover underlayment to comply with requirements specified in <br /> Division 07 Section "Sheet Metal Flashing and Trim." <br /> 3.5 METAL ROOF PANEL INSTALLATION, GENERAL <br /> A. Provide metal roof panels of full length from eave to ridge unless otherwise indicated or <br /> restricted by shipping limitations. <br /> B. Thermal Movement. Rigidly fasten metal roof panels to structure at one and only one <br /> location for each panel. Allow remainder of panel to move freely for thermal expansion <br /> and contraction. Predrill panels for fasteners. <br /> 1. Point of Fixity: Fasten each panel along a single line of fixing located at ridge. <br /> 2. Avoid attaching accessories through roof panels in a manner that will inhibit <br /> thermal movement. <br /> C. Install metal roof panels as follows: <br /> 1. Commence metal roof panel installation and install minimum of 300 sq. ft. (27.8 <br /> sq. m.)in presence of factory-authorized representative. <br /> 2. Field cutting of metal panels by torch is not permitted. <br /> 3. Install panels perpendicular to purlins. <br /> 4. Locate and space fastenings in uniform vertical and horizontal alignment. <br /> 5. Provide metal closures at rake edges,rake walls and each side of ridge caps. <br /> 6. Flash and seal metal roof panels with weather closures at eaves,rakes, and <br /> perimeter of all openings. <br /> 7. Install ridge caps as metal roof panel work proceeds. <br /> 8. End Splices: Locate panel end splices over,but not attached to, structural <br /> supports. Stagger panel end splices to avoid a four-panel splice condition. <br /> 9. Install metal flashing to allow moisture to run over and off metal roof panels. <br /> SEWER LIFT STATION NO.24 REPLACEMENT PROJECT,UP 3313 <br /> Division 7 Thermal and Moisture Protection Page 07411-11 April 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.