Laserfiche WebLink
M 0 <br /> • M <br /> 3.10 FIELD QUALITY CONTROL <br /> A. Manufacturer's Field Service: Engage a factory-authorized service representative to <br /> inspect metal roof panel installation, including accessories. Report results in writing. <br /> B. Remove and replace applications of metal roof panels where inspections indicate that <br /> they do not comply with specified requirements. <br /> C. Additional inspections, at Contractor's expense, will be performed to determine <br /> compliance of replaced or additional work with specified requirements. <br /> 3.11 CLEANING <br /> • <br /> A. Remove temporary protective coverings and strippable films, if any, as metal roof <br /> panels are installed unless otherwise indicated in manufacturer's written installation <br /> instructions. On completion of metal roof panel installation, clean finished surfaces as <br /> recommended by metal roof panel manufacturer. Maintain in a clean condition during <br /> construction. <br /> B. Replace metal roof panels that have been damaged or have deteriorated beyond <br /> successful repair by finish touchup or similar minor repair procedures. <br /> END OF SECTION <br /> • <br /> • <br /> SEWER LIFT STATION NO.24 REPLACEMENT PROJECT,UP 3313 <br /> Division 7 Thermal and Moisture Protection Page 07411-14 April 2012 <br />