My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/03/07 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/03/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 11:44:22 AM
Creation date
3/6/2017 11:43:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/7/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br /> PROJECT TITLE: <br /> Call for Bids for Construction X Consent COUNCIL BILL# <br /> of New Clearwell at the Water Action Originating Department PW-Utilities <br /> Filtration Plant First Reading Contact Person John McClellan <br /> Second Reading Phone Number 257-8201 <br /> Third Reading FOR AGENDA OF March 7, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Water Filter Plant Consultant Design PW-Utilities <br /> Contract <br /> Amount Budgeted $18,000,000 <br /> Expenditure Required $500 Account Number(s): UP-3198-1 <br /> Budget Remaining 17,999,500 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The 2002 Water Filtration Plant(WFP) Facilities Plan outlined project recommendations to maintain and <br /> improve operations at the plant. Recommended projects include construction of a new clearwell facility to <br /> increase plant capacity and improve flow management in the water transmission system. The existing <br /> clearwell is nearly 25 years old and cannot be taken off line for long periods of time to allow for maintenance <br /> and repairs until the new clearwell is constructed. The new clearwell will improve drinking water <br /> disinfection operations, aid flow management, and increase effective plant capacity. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize advertisement for a call for bids for construction of the Water Filtration Plant's new clearwell. <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.