My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007/03/07 Council Agenda Packet
>
Council Agenda Packets
>
2007
>
2007/03/07 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 11:44:22 AM
Creation date
3/6/2017 11:43:44 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/7/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 5 <br /> PROJECT TITLE: <br /> Consent COUNCIL BILL# <br /> Award of Contract for the X Action Originating Department Public Works <br /> Construction of the South End First Reading Contact Person Souheil Nasr <br /> Interceptor North Segment Second Reading Phone Number (425)257-7210 <br /> Sewer Protection Project. Third Reading FOR AGENDA OF March 7, 2007 <br /> Public Hearing <br /> Initialed by: <br /> Department Heal <br /> 111/ <br /> CAA /•"tr, <br /> Council President <br /> Location Preceding Action Attachments Department(s) Approval <br /> BNSF ROW, South of Authorization to call for Bid Tabulation Public Works <br /> 36th Street, east side of Bids,January 24,2007. <br /> I-5 Budget Committee,2/28/07 <br /> Amount Budgeted $1,500,000 <br /> Expenditure Required $ 384,606.90 Account Number(s): <br /> Budget Remaining $1,062,093.10 UP 3283 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The South End Interceptor-North Segment, 36" Sewer Protection Project is currently being bid with the bid <br /> opening scheduled for Tue. February 27, 2007. The Engineer's estimate is $390,000 including sales tax. <br /> Nine bids were received at the bid opening on February 27, 2007. KLB Construction, Inc. was the lowest <br /> responsive bidder with a bid of$384,606.90 including sales tax. <br /> Council previously approved $51,300 for design services and $2,000 for bid advertisement expenses. The <br /> total expenditure for this account to date is $437,906.90. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Award the Construction of the South End Interceptor North Segment Sewer Protection Project to the lowest <br /> responsive bidder, KLB Construction, Inc., in the amount of$384,606.90 and authorize the Mayor to sign the <br /> contract with KLB Construction, Inc. <br /> 22 <br /> S:\SNasr\36th St Sewer Protection\Council Agenda-Construction Award.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.