My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2105 BROADWAY BEHARS FURNITURE 2018-01-02 MF Import
>
Address Records
>
BROADWAY
>
2105
>
BEHARS FURNITURE
>
2105 BROADWAY BEHARS FURNITURE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 9:07:32 AM
Creation date
3/6/2017 3:04:51 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
2105
Tenant Name
BEHARS FURNITURE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� / <br /> � <br /> FINAL �� �LARATION OF NON-SIGNIFICADICE `-�"' � : � Q ¢ � <br /> Descciption of Proposal �p <br /> g ernits to allow construction of an n{� <br /> The proposad action is the issuance of buildin p <br /> considered p�rior3to making atpreliminaryhdecisionnonuthiatproposale following factors were s` <br /> 1. The proposed site is currently used for oarking. Additional parking must �/���� <br /> be provided in accordance with City Code requirements. � / <br /> ' Z. The site is zoned C-1, general commercial, and allows thia use. <br /> _ Za� a�- � <br /> . � � � 5� �' 1�:;C,'iilm! <br /> 3. Access will he provided via 9roadway, a ma3or arterial. <br /> proPonent: �C+ <br /> L. E. Noblitt � S <br /> � <br /> P.O. Box 129S `''\'1� " <br /> Everett, Wa. 98206 <br /> D�''" �1g,�9 <br /> Location of Proposal `�P� , •• "'��� '(� • <br /> . ...�..�v�R P� <br /> S.E. Corner of Sroadway and 21st Street I„C\�� QcJ.\��p <br /> E��p� <br /> Lead�_ City of Everett Planning Departnnet <br /> Contac�SOII� Bob Landles <br /> Phone: 259-8731 <br /> This proposal has been determined not to have a significant adverse impact on the <br /> environment. An Environmental Ir�pactyStatement ig no* of4aicompleted envirocunentalo(Z� �c) . <br /> � This decision was made after review b the lead a ency <br /> checklist and other information on file with the lead agency. <br /> A fifteen day review period has elapsed for this project and no adverse comments were <br /> received, ' • <br /> Responsible Official: Reid H. Shockey <br /> Title: Planning Director <br /> Date: Piarch 7, 1978 <br /> Slgnature: � — �� <br /> NOTE:This final Declaration of Non-Signifi.cance may be withdrawn in the event of � <br /> significant clianges in this proposal. <br /> I � <br /> � <br /> i.:- _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.