My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7530 CASCADE DR LIONS PARK RESTROOM 2016-01-01 MF Import
>
Address Records
>
CASCADE DR
>
7530
>
LIONS PARK RESTROOM
>
7530 CASCADE DR LIONS PARK RESTROOM 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2017 3:15:18 PM
Creation date
3/6/2017 3:14:55 PM
Metadata
Fields
Template:
Address Document
Street Name
CASCADE DR
Street Number
7530
Tenant Name
LIONS PARK RESTROOM
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/11/2008 10:30 FA% 4252578T42 �005/005 <br /> (3ENERAL INFORMATION <br /> 1. Puget Sound Energy Is the naturei gas provider In thls area. To initfate new servlce <br /> orde�s,plaaso contact Marilyn Devis Westlund at (426)356-7612 at least 90 days prlor to <br /> the requfred in-servlce dete. <br /> Any rolocatfon of existing gas faciliHes for thls development wlll be at the developer's sole <br /> expense, and requlres 90 days minlmum notice, Please Contad Elatne Babby at(206) <br /> 224-2018 to coordlnate relocatlon requeste. <br /> 2. The Snohomish County PUD currently hes sufllclent wpaclty to serve the proposotl <br /> development. For turther Information ebout the electrlcal aervlce roqulremonts for thls <br /> proJect,pieeee cell Kurt Mardn oF tha DlstrloYs Cuetom�r Enginsering OfRCe, Everett at <br /> 258-8291. <br /> 3, Verizon Northweat hae feclliUee neer thia loceUon. Howevar, eny building entroncee muet <br /> be coordinated at least 6D deye In edvenes. Ths wat of eny relocotion of Verizon fedlitlge <br /> that la requlred to conahuct the new epartmentn wlll be et the totel expenee oi the <br /> developer. Any relocalion will Wka 60 to 120 dayY. Pleese contaM Mike Hupf, Engineer et <br /> (425)356•4062 or Mika Bly, Enginaer ot(425)356-4034 It you have any quesUona <br /> regarding thie building entronce. <br /> 4. Verizon Northwest wlll provide eervioe to the site. However, new telephone cable <br /> constructlon wlll be required In conJundlon wlth the slte development, Verizon'e <br /> engineerin8 will begin when they are nolifled of your wnsirucGon schedules end telephone <br /> raquirements. <br /> 5. It will be lhe developeYs rosponsibility to provide a suitabls Combinetlon of conduit end <br /> trenchinp andlor riser conduit to eccommodate Verizon'e network communicatlone cable <br /> within the complex, Provlded that an ecceptable combinetion of conduit and/or trenchina <br /> is incorporated into the projed to accommodate Verizon's entrance cable,there will be no <br /> costs to lhe developer for Varimn's cahle. <br /> 8, If a rearrangement of axicling cablea on premisee or on the ripht•of-way is nacaerary, <br /> appropriate chargas will bc asOmatod and Vorimn's Ouarenty oi Paymenl from wlll bs <br /> fonvarded to you for your sipnalurt►. Prior la commencernent of Verizon's enginwring for <br /> such reArrangement, a deposlt wlll be required. To insure timely telephone servlce, <br /> Verizon roqucsls nlnety (80) days lead time for en9ineering, procurement. and Installation <br /> of cable ond/or Verizon's equlpment. <br /> Pisese contact Mlchael Hupt, Engineering,at (425)356-4052 or Mike Bly, Engineer at <br /> (425) 366-�1034 should you requlre eddltlonal Intortnatio�. <br /> S:�fS�tld�qlw�NWORD�6EPAW7-OB7llona Pnrk Flnel.dx <br /> i <br /> � <br /> �I�) <br />
The URL can be used to link to this page
Your browser does not support the video tag.