Laserfiche WebLink
POI:ING NOR'Tll PARF:ING I.07' <br /> CONSTRUCTION D"..ANAGL-DII=NT !'I�1N <br /> AUGUS'I'3Uth, 1991 <br /> During ancl after the fill uperatiun excess material +vill b� hauleel w the Scwth <br /> Complez Preload. Utilities�.•ill be installed immedia[ely once subgrade is <br /> achic�•ed. <br /> Por construction access, a entrance road from the N. Perimeter Rd. ��•iil be <br /> constructed �cid� quarry spalls to aid in d�e cleaninR of truck tires. The N. <br /> }'erimerer Rd. n�i11 be kept de�n during our operation ��•it'i ���ater trucks and <br /> s��eepers. <br /> The most impar�ant utilit�•acti��ity is the re•construction of the north pond at <br /> the tip of the futurc parking cxpansion. Aftcr exca��ation is completc, :2" of �op <br /> s�il ��•ill he plared�n the sl�Pes and h��dr�>seeded immediatel}� fnr stahili�atio;i. <br /> The filter fabric tence at che bottom n ill he enhanceci �cith sira�� haies behind <br /> the���ire tabric for additional protection. <br /> PHACING Sr�{F� II L <br /> 1. Flag& Clear Sitc <br /> 2. Install filtcr fabric fcncc at perimctcr <br /> 3. F.xcavate retenti�n P�nd <br /> �1. Replace top soil at pond area slo�es <br /> S. H�•droseed Slopes <br /> 6. Strip& stockpile onsite top soils <br /> 7. Onsite cut & fills <br /> 8. Expurt excrss material tc, �,relu.i�l <br /> 9. inscallation of storm uiilii� <br /> 1�. Install curbs & sidc��;�ll;�, � <br /> 1 l. fnstallati�n �f elenrir,�l <br /> 12. Pa��ing & Striping <br /> 3 <br />