Laserfiche WebLink
�DRAFT <br /> structure. KeysWne Retaining Walls have been installad around other nearby pazking lou at the <br /> Boeing Everett Facility. Detailed design parameters can be provided if this type of wall is <br /> selected. <br /> OeotexUle or Reiniorced Eerth Wail <br /> Geoteztile walls are conttruaed by placing the geotezale in layers wittiin the fiil with about <br /> 1 foot of compacted soil between the layers. 'It�ese walls are also relatively low cost although <br /> they typically do not provide a uniform face. <br /> A "Reinforced Eanh Retaining Wall" is wnswcced by using metallic reinforcemeot svips <br /> layered within the fill. In most cases, the reinforced carth mazs has a facing of precast concrete. <br /> T'6is type of retaining wall is the most expensive and is more suitable for larger embankments. <br /> PAVEMENT CONSIDERATIONS <br /> The pavement subgrade should be prepared in accordance with our recommendations for <br /> site preparation. We recommend that the parking area subgrade be thoroughly proofrolled with <br /> heavy equipment in areas of cut or areat disturbed by construccion to ezpose areas of aoft, loose <br /> or wet soils which require additional compaaion or excavation and replacement with structural <br /> fill. Recommendations for placement and compaction of subgrade soils are p:esented in a <br /> previous section of this report. <br /> Because of the rapid construction schedule, trafficability of the siiry-sand soils and for <br /> drainage considerations, we recommend that a subbaze layer be planned az part of the pavement� <br /> sectioa in parking and driveway areas, The subbaze layer should consist of a minimum 8-inch <br /> thicirness of I'h-inch minus material with less than 5 percent passing the U.S. No. 200 sieve. <br /> We recommend a CBR value of 15 be used for design of pavement sections over subgrade <br /> placed and compacted as recommended. ' <br /> DRAINAGE CONSIDERATIONS <br /> We recommend that the parking areas be sloped lo drain such that sur(ace runoff is <br /> collected and carried off the site. 1he subbase recommended for support of the pavement will <br /> aa as a drainage layer to transport the water from beneat� the pavement section. <br /> LIMITATIONS <br /> We 6ave prepared ehis report for use by Reid Middleton, The Boeing Company and other <br /> members of the design tcam for use in design of a portion of this project, The report is not <br /> inteaded for use by others and the information contained herein is not applicable to other sites. <br /> The data and report should be provided to prospecti�e contractors for their bidding or estimating <br /> purposes, but our report, conclusions and interpretations should not be conswed az a warranty <br /> of the subsur[ace conditions. <br /> G c o E n p i n e s t � IO Filc No.01I0.150.R10�062292 <br />