Laserfiche WebLink
Iniruductiun: <br /> � � This drainage report deals ��ith the stonn �i�atcr impro��ements for the fint phase of the <br /> proposed North Parking Lot Expansion, depicted as part ofthe west sub-basin on Figure 3- <br /> 2 in the Nonheast Expansion Area described in the "Srormwater Assessment for Draft <br /> • Environmental Impact Statement, Master Plan Expansion, Boeing Commercial Airplane <br /> Group, Everett Division, Everett, Washingron", dated February 1991, prepared by CH2M <br /> Hill (henceforth referred to as the Boeing EIS.) Specifically that portion I��ing north of the <br /> existing North Perimeter Road and west of the Fluke property. <br /> Based on our understanding of the Boeing E13 all but a small portion of this project is <br /> aibutary to what is identified as the West Detention Pond. The remaining ponion of the <br /> project site is trib�tary to the existing Boeing Powder Mill Gukh stonn �rater detention <br /> facilities westerly of the site. <br /> 1 <br />