Laserfiche WebLink
MAYn In"NO ENOINEE1114 INC. <br />October 8, 2001 <br />City of Everett <br />Building Division <br />3200 Cedar <br />Everett, WA 98201 <br />Attn: Mr. Tim Tyler <br />13 MOT <br />n OCT 2 9 2001 <br />................... . .......... <br />CITY OF EVERETT <br />nglnes ring lPubllc services <br />Re: Boeing 40-22/23 Building Structural Upgrade <br />E, F. F', d from 1-11 <br />Everett, WA <br />MTE Project I1E5105 <br />Gentlemen, <br />EMW OOM <br />917-1341h Shoo SW <br />Suft A-1 <br />Everett. WA 98204 <br />ph 425.742.9360 <br />fez 425.745.1737 <br />racoon dree <br />10029 S. Tecaro Way <br />Su6e E-2 <br />Tacoma, WA 98499 <br />ph 253.564.3720 <br />fax 233.564.3707 <br />â–ºarena OBroe <br />7911 NE 33rd Drive <br />suite 190 <br />Portland, On 97211 <br />ph 503.281.7515 <br />fax 503,281.7579 <br />FINAL LETTER <br />Permit 0 00005-005 <br />This is to inform you that registered special inspections have been completed for this project as <br />per our reports, copies of which have been sent you. <br />To the best of our knowledge, all work inspected was either performed in accordance with, or <br />corrected to conform to, the city approved drawings, or engineer approved changes. <br />Special inspection was provided for: <br />Visual Weld Inspection <br />Nondestructive Testing <br />High Strength Bolling <br />We trust that this provides you with the information which you require. Should you have any <br />questions give us a call. <br />Sincerely, <br />MAYES TESTING <br />A <br />Michael S. Dolder, P.E. <br />`' ;e President <br />MSD:Iak <br />E8106.closing(Sept. 2001) <br />cc: Boeing - Sharon Culbertson <br />