Laserfiche WebLink
PLANNING AA ►O Paul A. Rooms <br />C4911"14"ffy OEMOMFEr Ulrsoto► <br />August 15. 1996 <br />Dirk H. Fieldcamp, Jr. <br />Civic Interface Manager <br />Boeing -North Region Facilities <br />Boeing Commercial Airplane Group <br />P.O. Box 3707 <br />Seattle, WA 98201 <br />HgoINN 101 <br />AUG 1 91996 <br />CITY OF EVERETT <br />Public Works D:pt. <br />Re Construction of 400,000 square feet of support facilities in the tnaaukictunlg buildings <br />Dear Dirk: <br />1 have reviewed your August 8, 1996, letter advising us on Boaing's astern to cootWet 400,000 square <br />feet of support facilities within the main factory complex on the Boeing Everett site. I cancan that the <br />1978 Boeing EIS, and the 1991 Boeing EIS and Decision Dncummt provided approval for the $Psce <br />identified in your letter. Boeing's plans to construct 400,000 square feet of support space are consistem <br />with the above documents and SEPA approvals. <br />aircra8 production and noise parameters w'd!>m the <br />impervious surface arm utility wnaurttptior4been suet. Please <br />and Decision Document. All necessary SEPA requirements have previ0t* <br />proceed to work with the appropriate City departments to secure the necessary permits. <br />Please contact me or Gary Doughty at 259-8731 if you have any questions. <br />Sincerely, <br />i <br />Paul A. Roberts, hector <br />Responsible Official <br />c: Larry Crawford <br />Tim Tyler <br />Asst. Fire Marshal Baty <br />C13 <br />CITY OF EVERETT <br />2930 Wetmore Avenue. Suite 100 • Everett. WA 98201 • (206) 259-8731 • Fax (206) 259-8742 • Scan: 723.8731 <br />