My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-23 2018-01-02 MF Import
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-23
>
3003 W CASINO RD BLDG 40-23 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2022 2:38:28 PM
Creation date
3/6/2017 3:34:43 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-23
Imported From Microfiche
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br />a THE AUSTIN <br />COMPANY <br />ARCHITECTS • ENGINEERS • BUILDERS <br />2 October, 1996 <br />Ms. Sharon Culbertson <br />BCAG Facilities - Everett <br />P.O. Box 3707 <br />Seattle WA 98124 <br />Project: High Bay Factory Office Build -Out <br />Boeing Commercial Airplane Group <br />Everett, Washington <br />Austin W.O.96-5656D <br />Re: Design criteria <br />Dear Ms Culbertson: <br />000 SOUTHWEST I,STH ST. <br />RENTON, WA ESOSS <br />►HONa: 2OS/]]S-NSOO <br />T[ LC C O►I U1: 204/2S 6S471 <br />32]-O 1 11U-ST-IC•T377N1 <br />� t r ^rino D <br />T <br />Ctldh• r fl �t�..(1,1�[j � M rfj O <br />UV l1I lS <br />�ko 0 I 1+ 1996 <br />CITY OF EVERETT <br />Bldg. Permlt Counter <br />This letter outlines several of the standards and guidelines that are being used in the design of the <br />High Bay Factory Office Build -Out project. <br />In general, the 1990 High -Bay Factory Expansion served as the baseline for design criteria and <br />building code interpretation. The 1990 High -Bay Factory Expansion was designed under the 1988 <br />and 1991 editions of the UBC. We attempted to remain as consistent as possible with the 1990 <br />High -Bay Factory Expansion project in our interpretations of the UBC, and in the application of <br />specific variances that were granted by the City of Lverett for that project. These interpretations <br />are described below. The current High Bay Factory Office Build -Out project is designed under the <br />1994 edition of the UDC. Issues specifically related to the interpretation of the current code are <br />also described below. <br />I. In general, exit potential to the tunnels is increased from all levels, since additional stair <br />towers will be built to provide two means of egress for the new office areas. In no instance <br />does the occupancy of a new office level create a load on the tunnel exitway larger than i <br />the factory floor. The pedestrian tunnel exit width is sufficient to meet the combined <br />tributary areas of the factory Floor and tower levels. 10 o 0o i c if <br />2. The occupant load for the factory floor is I occupant per 1000 s.f. This is consistent with <br />the occupant load factor used in the 1990 High -Bay Factory Expansion. <br />3. No new spaces are assembly areas. 1) <br />ie, <br />4. The tower office spaces are subordinate uses to manufacturing, and are considered to be <br />mezzanine levels. This is consistent with the 1990 High -Bay Factory Expansion. -- <br />Of ccll CL-FV, LAIRY, Sri -> � Lr V S/>+ M wil h f'RFsfARIrp <br />ly <br />
The URL can be used to link to this page
Your browser does not support the video tag.