Laserfiche WebLink
Ginny Boersema <br />From: <br />Sent: <br />To: <br />Cc: <br />Subject: <br />Greg ; <br />Cliff Lindman <br />Tuesday, November 02, 2010 10:21 AM <br />'gvn ndecasteele @ k i rtley-cole. co m' <br />Kirk Brooks; Ginny Boersema; Ralph Dujardin <br />As Construction Drawings - Everett Mall Retail Pad <br />��il����-PU� <br />The City of Everett still has not received As-Constructed drawings for the above mentioned project, as you are aware of <br />by our numerous phone conversations. <br />It is specifically stated on the first page of the Design& Construction Standards and Specifications 1-3 that the <br />developer/contractor shall furnish this drawings. Furthermore the permanent Certificate of Occupancy has not been <br />issued, and will not, until these drawings have been received. <br />Please see to it that these documents are sent to us as soon as possible. <br />Thank you for your cooperation in this matter, and should have any questions or concerns feel free to contact me. <br />Cliff lindman <br />City of Everett Construction Inspector <br />Phone(425-339-7404) <br />