Laserfiche WebLink
� � � � <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated <br /> 5. Connect side sewer per City Standard #601. <br /> � Connect side sewer per City Standa�d #'s 601, 60�, 604. <br /> �Connect all rooftop downspouts to the side sewer. <br /> 8. Connect rooftop downspouts to the drainage sys*em provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout in!iltration system per City of Ev�rett <br /> Storm Manual 3-2.6.2. Width _, Depth _, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discus� potential drainage <br /> routing prior to beginning the project. <br /> 11 Instali erosion control measures as determined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion blankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13 Remove erosion control measures upon completion of the project prior to final approval of the <br /> permit. <br /> 14 All excavated material from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this b�ilding lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be repiaced). <br /> 1�. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17 Pave driveway from the�property line out to the street paving. <br /> 18. Contact the Water District tor connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan TM402 with a gas trap per Standard Plan n410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this building in compliance with the requirements of NFDA <br /> Standards 13D. <br /> Z/L' <br /> PIVCcmrents <br />