Laserfiche WebLink
everett INSPECTION REPORT <br />Address 1��40le <br />v Sf7�7 r <br />Contractor6 _mot <br />Owner ' <br />Date <br />! BLDG: Pmt <br />y ELEC: Pmt. <br />/❑ Temp. Elect <br />❑ Footing <br />❑ Foundation <br />❑ Ductwork <br />❑ Wood Stove <br />❑ Masonry <br />TYPE OF INSPECTION REQUESTED <br />No. ❑ MECH: Pmt. No. <br />No. 7/ P / ❑ PLBG: Pmt. No. <br />❑ Framing <br />❑ Gas Piping <br />❑ Drywall. Nailing <br />❑ Consultation <br />❑ Shear Nailing <br />❑ Groundwork <br />❑ Grid <br />❑ Struct. Slab <br />Rough -In <br />❑ Final <br />Service <br />❑ _ <br />APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CEHTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />Inspector <br />