Laserfiche WebLink
4INSPECTION REPORT <br />Address <br />Contractor �—'-- <br />(( — <br />�G�4u"� Owner <br />Date /�� <br />TYPE OF INSPECTION REQUESTED <br />❑ BBLDG: Pmt. No. ❑ MECH: Pmt. No. <br />��`_ <br />;y-tLEC: Pmt. No. ��❑ PLBG: Pmt. No. <br />❑ Gas Piping <br />❑ Consultation <br />❑ Groundwork <br />❑ Struct. Slab <br />❑ Final <br />❑ Temp. Elect. <br />❑ Framing <br />❑ Footing <br />❑ Drywall, Nailing <br />❑ Foundation <br />❑ Shear Nailing <br />❑ Ductwork <br />U Grid <br />❑ Wood Stove <br />q Rough -In <br />❑ Masonry <br />ervice <br />APPROVAL O PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />C Was not able to perform inspection. <br />❑ CALL 2F9-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />