Laserfiche WebLink
i <br />INSPECTION REPORT <br />Address <br />TYPE OF INSPECTION REQUESTED <br />BLDG: Pmt. No. _ Z2q-��—❑ MECH: Pmt No. �— <br />❑ ELEC: Pmt. No. --❑ PLBG' Pmt. No. ��-- <br />❑ Framing 0 Gas Piping <br />❑ Temp. Elect. �prywall, Nailing O Consultation <br />❑ Footing ❑ Groundwork <br />❑ F❑ Shear Nailing oundation ❑ Grid ❑ Struct Slab <br />❑ Ductwork ❑Rough -In ❑ Final <br />❑ Wood Stove ❑ Service ❑ �� <br />❑ Masonry <br />APPROVAL El PARTIAL APPROVAL <br />/ VIOLATION ❑CORRECTION REQUIRED <br />III! ❑Corrections listed below MUST BE MADE before work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspection. <br />❑ CALL 259-8810 FOR REINSPECTION — 24 hour notice required. <br />THE PREMISES OF <br />OC TO OCCU SHALL <br />ANCYE ISSUED AND POSTED ON <br />Inspector <br />7 <br />�{ everett <br />e <br />SNaNHJOU 'PINIDIHO Hill d0 XIIW65 aH.t <br />OS ana SI 1I 'HOISON SIHI NYHI HV273 <br />SSH'I SI .LN27WDOU UHWIIAONDIN SIHI dI <br />INSPECTION REPORT <br />Address '5 / <br />Contractor <br />Owner <br />Date <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. ❑ MECH: Pmt. No. <br />❑ ELEC: Pmt. No. %3 ❑ PLBG: Pmt. No. <br />❑ Framing ❑ Gas Piping <br />❑ Temp. Elect. ❑ Drywall, Nailing ❑ Consultation <br />❑ Footing ❑ Shear Nailing ❑ Groundwork <br />❑ Foundation ❑ Grid [I Struct Slab <br />El Ductwork ❑ Rough -In 0 Final�__� <br />[I Wood Stove ❑ Service <br />❑ Masonry <br />❑ APPROVAL ❑ PARTIAL APPROVAL <br />❑ VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE before work can be approved. <br />r❑f Please contact <br />of able toinspector and arrange perform inspection. for appointment <br />259-8810 FOR REINSPECTION — 24 hour notice required. <br />A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO OCCUPANCY. <br />`j F o Date <br />Inspector <br />