Laserfiche WebLink
208.3 Preliminary Structural Engineering—Peterson Structural Engineers (Peterson) will provide <br /> structural engineering support for the project up to the 30 percent design completion level. <br /> A more detailed description of the services to be provided follows. <br /> • Preliminary geometry assessment and foundation load summary. <br /> • Review of geotechnical information provided by GeoEngineers. <br /> • Generation of preliminary gravity and lateral design loads. <br /> • Perform design and generation of preliminary construction drawings up to the 30 percent <br /> design completion level. <br /> • Provide preliminary design documents for design review submittal. <br /> • Prepare preliminary design memo for the structural elements. <br /> • Attend one meeting with the City to review draft pre-design documents. <br /> • Provide finalized 30 percent preliminary design structural drawings and technical <br /> memorandum. <br /> 208.4 Preliminary Electrical Engineering—R&W Engineers (R&W)will provide electrical <br /> engineering support for the project up to the 30 percent design completion level. A more <br /> detailed description of the services to be provided follows. <br /> • Perform site visit and review information about existing utilities. <br /> • Perform load calculations for electrical service. <br /> • Prepare preliminary electrical engineering technical memorandum. <br /> • Prepare preliminary one-line diagram, electrical demo plan, electrical site plan, valve <br /> house electrical plan. <br /> Task 301 —Unanticipated Labor or Expenses <br /> This task will include additional unanticipated labor or expenses not specifically identified in the <br /> scope of work tasks defined above. Such work items will be implemented on a work order basis <br /> and will be undertaken only after written authorization from the City's Project Manager. <br /> ESTIMATED SCHEDULE <br /> MSA is prepared to begin work on this project immediately upon receipt of notice to proceed from <br /> the City. Services contained herein will be completed while working in close coordination with <br /> City staff within the project schedule provided as Exhibit C. <br /> ENGINEERING FEE ESTIMATE <br /> An engineering fee estimate, Exhibit B, has been prepared with a supplemental services <br /> management reserve for Phase 1 based on the detailed scope of services contained herein. The City <br /> will provide written authorization prior to proceeding with any Supplemental Services. <br /> City of Everett MURRAY,SMITH&ASSOCIATES,INC. Replacement of Reservoir 2 <br /> January 12,2017 Engineers/Planners Prelim Design Page 12 <br />