Laserfiche WebLink
� g A 5�c. # l(0 9 Atiaclment C <br /> ��� <br /> � Plans Exam�ner and Inspector Checklist <br /> Pe,,,,,t Na. 39 ► �Z Address 5�25 �� -�R 5� <br /> ����� <br /> Plans Facamtner: Chedc,write in WA,or fill in value on shaded boxes. <br /> Inspectoc': Check ott boxes at left as items are found to comply. <br /> Compllance epproach: (check one) �Systems analysis ❑Component peAormance �escriptive peth <br /> Note: Some specifics on this torm may not appty if <br /> A) compliance appruach is systems analysis or component performance; <br /> B) compliance to minimum ventilation criteria is demonstrated through engineering calculations or performa�ce testing. <br /> FOU�DATION PW�E <br /> ❑ Sleb:F}�.��1,..�Extedor down to frostllne/sleb bottan;or IMedor 24"horizontal or vertical;a.M radlant,under entlre sleb <br /> ❑ BNowgrad��zt�rlorwdllnsW�don: ��j(a,_�.� (ItlMedor—seelnsuletlonPhase) <br /> ❑ R�don mltlg�don:��,�If locally requlred,or aewlspace venllng<1fV300ft2 of crawl,or venta Indude en operede demper <br /> ���� <br /> ❑ Framing: I�Stendard ��Intermedlate I___J Advenced <br /> ❑ Std elr s�al:solepVsubflr;rim JsVmud slll;wlndow&door frms;penetretlon•wire,plumb,duct,pertlllon shxls,flue,llght flMures <br /> ❑ Souro�ap�clflc�xh�ust t�ns: Slze requlrement—bath,laundry(SOcfm);kitchen(100chn) <br /> ❑ Whol�houu exhawt fan �Q3,ol� Intermlttent system hes manual 6 auto controls;Outdoor alr supply req.la hebltede rms. <br /> or <br /> ❑ IM�grot�d forc�d+lr cy�t�m n outslde eir duct(with demper)allowing between.35 end.5 ACH <br /> NSIllAT10N PWI,SE <br /> ❑ p. ��� Wall In�ulatlon(ebov�gred�) <br /> ❑ ���� Wdl Insuletlon(bdow g►ed�):Interlor well Insuletion <br /> ❑ �"lti _"�� Floor lnwletlon <br /> ❑ �._3--p--� CMling Insulatlon:Induding ettic hatch <br /> ❑ �.;_3(j_ ' ,'] Vauk�d c�lllnp Insulatlon <br /> ❑ Vapor nterd�n:walls,tloors celling <br /> ❑ H�atlng ayst�m typr. ���� _F`�' _.l For hentpumps,Ilst size,HSPF,and COP � ; <br /> APuF .78 FNAL PHASE <br /> ❑ Redon monitor on aHe:wlth Instrudlons and general Inlormatlon <br /> ❑ Thertnostet:hoat range,55-75;AC rango,70•B5;both,55•85.Backup heat contro�s prevent simultaneous operatlon ol primary sys. <br /> ❑ Solld tuel eppllencea:glass or metel doors;dlrect comb.alr source,or 4"dia.,dampered.Indirect source for uncond.areas <br /> ❑ Flrepleces:6"combustion air suppiy dud w/damper direct to Ilrebox;tlghllitUn9 glass or metel doors. <br /> ❑ DHW h�atan:NAECA labet;separate power or gas shut-ofl;on R-10 pad il elearic and In uncond.area or II on concrete <br /> ❑ NNchanlcel vantllatlon ducts In�ulnt�d to R-4:exheust duds In uncorxlitloned arees/supply duds in condkioned ereas <br /> ❑ �. .� _ � HVAC ductalpl�num Insulatlon:ducls In uncondltlonad ereas are;nsulated end�olnls are sealed <br /> ❑ Plps Insulatlon:R•3 for hot end cold water plping In uncondltloned areas(It service or redreulaling,see Table 5-1'_) <br /> ❑ Qround cover:6 mll bleck polyethylene/epproved equal lepped 12"at�olnts and eMending to foundatlon wall <br /> � <br /> i <br />