Laserfiche WebLink
. ��� l (, <br /> PUBLIC WORKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated _ <br /> 5. Connect side sewer per City Standard k601. <br /> � Connect side sewer per City Standard #'s 601, 602, 604. <br /> 7. Connect all rooftop dowrispouts to the side sewer. <br /> S. Connect rooftop downspouts to the drainage system provided for this lot. <br /> � Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width� . Oepth �s', Length 30'. <br /> 10. The contractor must meet with the Pubiic Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 1�, Install erosion control measures as d2termined by the Public Works inspector, such as silt <br /> fence, straw bales, swales, or erosion biankets. <br /> 12. Install erosion control measures per City of Everett Standards for small parcels <br /> 13. Remove erosion control measures upon comp!etion of the project prior to final approval of the <br /> permit. <br /> �14. All excavated material from foundation, sidewalk and drivewa�s shall be hauled to an <br /> approved, permitted site. No wasting of material is allowed on this buiiding lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Pubiic Works Inspector (i.e. all unused <br /> driveways and any broken or damaged area must be replaced). <br /> 16. Install a Type I concrete driveway per City of Everett Standard #307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting prov�sions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #402 vaith a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system �s to be installed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the pubiic right-of-way. <br /> 21. A sprinkler syste�n is required for this building in compliance with the requirements ot NFDA <br /> Standards 13D. <br /> P1vComments S C <br /> � a / 0 / S' �-e-• 2%z <br />