Laserfiche WebLink
� �. <br /> Plan Check No. 91/2GG88 <br /> Page two of two <br /> r 7. No indication of how minimum ventilation requirements for ventilation <br /> in attic are met. <br /> 8. Provide minimum 22" x 30" attic access. <br /> 9. Provide minimum 4 mil vapor batrier in crawl space. Lap edges 12". <br /> 10. Indicate finished grade on typical wall section. Footing is required <br /> to be minimum 18" below finished grade and stem wall is required to <br /> extend a minimum of 6" above finished grade. <br /> In order for the processing of your application to co.itinue, it wi11 be <br /> necessary to provide the Building Department wit1� two complete new sets of <br /> drawings reflecting the corrections requested. <br /> Upon resubmittal of the drawings, youc application will be given priority and <br /> plan review will recommence. <br /> All of the above information shall be of sufEicient detail and conlain <br /> sufficient inEormation to ensure that Che proposed structure will be <br /> constructed in compliance with the City Building Code. <br /> Sections shall be applicable to plan submitted. <br /> Sincerely, <br /> Jeff Heilman <br /> Engineering Technician <br /> .IN:gab/11-6 <br />