Laserfiche WebLink
. �- � <br /> �UBLIC WJRKS PERMIT COMMENTS <br /> 4. As per Public Works approved plan dated_ <br /> 5. Connect side sewer per City Standard#601. <br /> �6. iConnect side sewer per Ciry Standard #'s 601, 602, 604. <br /> \/ <br /> 7. Connect all rooftop downspouts to the side sewer. <br /> � Connect rooftop downspouts to the drainage system provided for this lot. <br /> 9. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett <br /> Storm Manual 3-2.6.2. Width_, Depth_, Length_. <br /> 10. The contractor must meet with the Public Works Inspector to discuss potential drainage <br /> routing prior to beginning the project. <br /> 11. Install erosion control measures as determined by the Pubiic Works inspector, such as silt <br /> fence�, straw bales, swales, or erosion blankets. <br /> 1?.. Instail erosion control measures per City of Everett Standards for small parcels <br /> 13. Rs�nove erosion control measures upon completion of the praject prior to final approval of the <br /> permit. <br /> �II excavated mate�+al from foundation, sidewalk and driveways shall be hauled to an <br /> approved, permitted �ite. No wasting of material is allowed on this building lot. <br /> 15. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A <br /> & 306 on this proposal's frontage as directed by the Public Worlcs Inspector(i.e. all unused <br /> driveways and any broken or damaged area must be replaced). ' <br /> 16. Install a Type I concrete driveway per City of Everett Standard#307. <br /> 17. Pave driveway from the front property line out to the street paving. <br /> 18. Contact the Water District for connecting provisions for this building's <br /> water and sewer services. <br /> 19. A catch basin as per City Standard Plan #40;.with a gas trap per Standard Plan #410 is <br /> required for the parking area. <br /> 20. If a sewer pump system is to be instailed, the pressure line must discharge into a private <br /> manhole, then gravity flow across the public right-of-way. <br /> 21. A sprinkler system is required for this buiiding in compliance with the requirements of NFDA <br /> Standards 13D. <br /> PWComments Z�• <br /> 2 <br />