My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6007 1ST DR SE 2016-01-01 MF Import
>
Address Records
>
1ST DR SE
>
6007
>
6007 1ST DR SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 7:02:45 PM
Creation date
3/7/2017 7:02:30 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
6007
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ ' � _I ,.._. :C. <br /> i � <br /> i <br /> i <br /> I <br /> I <br /> 1 <br /> � � y _-- --- i <br /> � ' i <br /> � I <br /> ����iii � Geo�Engineeis � <br /> ��! "rI rozthstai Development � <br /> � January 3, 1991 <br /> O�� Page 2 � <br /> 7 , � <br /> ��� -� <br /> � _ Folloving clearing and stripping, the topographic ridges of the site �ere � <br /> �i ' cut to design subgrades. The excava[ed soils 4ere used to raise site grades <br /> QR and eonstrucc x'oad grades, drainage contcol features and 2s trench backfill �� <br /> N p" y " material. Fill placemenc and compaction vas monitored on a full-time basis �� <br /> 1 <br /> >y i fzom Sepcember 15, 1989 ta October 10, 1989 and on an intermlttent basis <br /> r,►a' - froa July 17, 1990 to August 20, 1990. I' <br /> �y�p � Construceion and pxepsraeion of the subgrades for .he road and sidevalk i <br /> �� � areas vere monitoxed on an intermitcent b�sis froa Jznuary 30, 1990 to <br /> � October 11, 1990. Ihe backfilling of the trenehes for utilities �as <br /> '� "� " 1 � monitored on an intermittent basis from Januaxy 30, 1490 through <br /> September 27, 1990. <br /> jInstallation of the drainage conerol measuees wzs moni:ored on an <br /> i <br /> • intermi[tent basis. Construceion of the temporary detention pond dam in t e <br /> ] "park" area was noc monitoted by CeoEngineers. Recocunendations fot the por.d <br /> liner ma[erial vece provided at your reGuest and placement of this matezial <br /> /���, • was observed to be in accordance wich our recowuendations. . <br /> I , CONCLUSIONS <br /> � Based on� our observations and the result> of in-place density :ests <br /> 1_�1 ,� during project eonstruction, it is out opinion that the geotechnical aspects <br /> `� <br /> ' for Phases I and II of the Hanabtook Projecc have been completed in general <br /> - compliance •. ith the plar.s and specificatior.s znd in accezd�nce �ith �ur - '. <br /> ,' i�� <br /> recommendations. CeoEngineers vas not consulted on the modified design nor <br /> I ��' <br /> � wern ve involved in the constructior. of the temposazy detention pond dam <br /> structure located vichin the park area. • . <br /> 1���� � � <br /> i ���� i � <br /> � <br /> � <br /> I '�,��1 - o o a - . <br /> � <br /> � � .�. .� I <br /> i <br /> ; . <br />
The URL can be used to link to this page
Your browser does not support the video tag.