Laserfiche WebLink
Paul McKee <br /> From: Rick Robinson <br /> Sent: Thursday,June 09, 2005 12:17 PM <br /> 70: Paul McKee <br /> Subject: RE: Boeing Rail Barge Facility <br /> None of the three requirements �eiow are necessary as they intenri to use the rail barge facility. <br /> Rick R. <br /> From: Paul McKee <br /> ��t: �,'.�,arsday,]une 09,2005 9:56 AM <br /> To: Rick Robinwn <br /> �bi�; RE:Boeing Rail 6arge Facility <br /> Rick, <br /> No permit nas been issued We are still in the plan review stage. <br /> I'm confident that we can have the fire alarm system and the fire lane designations added to the <br /> plan. <br /> as a firePdepartment turn arou d at the ntrance tol thelp er/pa k ng IotaWill that areaemeet yo�ed <br /> requirements7 <br /> Paul McKee <br /> City of Everett <br /> 425-257-8867 <br /> -----Original Message----- <br /> From: Rick Robinson <br /> Sent: Thursday,June 0�, 2005 8:37 AM <br /> To: Paul McKee <br /> Cc: Gerry Ervine;l'Jarren Bums <br /> Subject: Boeing Rail Barge Facilily <br /> Paul, <br /> Looks iike a permit was issued, bul lhree ilems are nol included as required in o�r <br /> 7I30104 response la Gerry's requesl for input: <br /> I. There is no dedicaled on-pier fire vehicle tumaround that I can find in lhe <br /> plans. <br /> 2. No fire alarm syslem (Needs manual pull slations and dedicated phone line). <br /> 3. No fire-lane designations. <br /> Our EIS says lhal the(ire marshal is supposed lo look at lhe plans prior to permiL Dodt <br /> lhink I saw these. <br /> Rick <br />