Laserfiche WebLink
Port of Everett <br /> Rail/Barge Transfer Facility - Operations Building r��C�C,c1 - C U � <br /> Proj. Na. MT-RB-2005-02.4 <br /> CIP No. 1-8-004-02 <br /> J]K, 2/26/08 <br /> Submittal No. 001-B — Building Shop Drawings <br /> Port Review Comments <br /> Comments on Shoo Drawinas <br /> 1. A-0.0 - Cover Sheet: No exceptions. Note correction regarding <br /> placement of the MSTA18 hold-downs. <br /> 2. A-1.0 - Floor Plan: Furnish as corrected and confirm. Note change to <br /> Door 101 hardware. Note comment regarding floor joist framing around <br /> hatch opening. <br /> 3. A-2,0 - Elevations: No exceptions taken. <br /> 4. A-3.0 - Building Section: No exceptions taken. <br /> 5. A-3.1 - Details: No exceptions taken. <br /> 6. A-4.0 - Interior Elevations & Plumbing: No exceptions taken except as <br /> noted; furnish as corrected. Note comment regarding the toilet paper <br /> dispenser. <br /> 7. E-1.0 - Electrical - Mechanical Plan: No exceptions taken. <br /> Other General Comments <br /> 1. In the comments on Submittal No. 001-A dated 12/5/07, we had asked <br /> for multiple other items which have yet to be addressed. At this time, we <br /> still require the following items: <br /> a. Roof truss shop drawings and calcs <br /> b. Letter of design certification from your Engineer <br /> c. Manufacturer's warranty on roof and siding metal panels <br /> 1 <br />