My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11222 2ND AVE SE 2016-01-01 MF Import
>
Address Records
>
2ND AVE SE
>
11222
>
11222 2ND AVE SE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2017 8:43:16 PM
Creation date
3/7/2017 8:43:07 PM
Metadata
Fields
Template:
Address Document
Street Name
2ND AVE SE
Street Number
11222
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to power lines, te%phone, fe%vision cnbles, fire olarms, and or <br /> other communicotion wiresshallbe under round. No!e: The <br /> only exception fo this requirement is con�ained in P/anning <br /> Director Interpretation#PDI4-99 doted 7/29/99 palicy. <br /> 10. A Vublic Works permit is required for this pro�ect. Detailed <br /> drawrngs in accordonce with City Desrgn ond Construction <br /> Stondards shall be submitted to the Public Works Department, <br /> showing utilifies, storm drainage, temporary const�uction <br /> erosion contro% ai�d oll required improvements in the ublic <br /> riyht-of-woy. Public Works Department approvnl of�hese <br /> drawings is required prior to ony permits be�ny issued. All <br /> improvementsshallbe completed, and warran}ed before the <br /> final approval isgranted. <br /> f I. All exp osedgraund must be reseeded wifhrn 30 days of the <br /> completion of construction. If reseeding is not prnctical due to <br /> weother or seasonal problems, fhe ground must be covered with <br /> mulch as directed by fhe City Engineer. <br /> 12. City str�eets ore to be kep t c%ar of dirt and debris ot oll fimes <br /> during construction. Dus} suppression and street c%oning musf <br /> occur as directed by the Public Works Inspector. <br /> 13. Storm water on this site shall be manoged in accordance with <br /> the City's 2010 Sform Wafer Monagement Manual. <br /> 14. The constr�uction plans must be desiy ned from a sife survey <br /> performed by a licensed State of Washington land surveyar. <br /> 15. As-builts of storm sewe� sanitary sewer, water systems, ond <br /> publrc improvements will be required to be submitted per Cify <br /> stondards <br /> 16. A one year guaraniee is required for public improvements and a <br /> twa yeor is require for drainage rmprovements far 10% of the <br /> omount of construction and impravements from the date of <br /> finol opproval. <br /> 17. Temporary erosion confrol measures for consfruction ocfivity <br /> must be operatronal prror to commencement of ony c%aring or <br /> eorfhwork. <br /> 18. An��gradrng/fill oi� this site shall be done so as to not impact <br /> the surrnundiny praperties. <br /> i,9. Ti�stall Z 'Na Parl�ing"si�gns(MUTCD Sign R7-1)along project <br /> fi^ontoge neor north and south prop erty lrnes to contro/parking <br /> along newly improved 2'd Avenue SE frontage. <br /> Ci�y of Everett R <br /> 3700 Cedar Street, • Ei�eretf, 11/A 98201 � (4Z5)257-7283 •Fnx(425)257-81i57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.